Results

676 - 700 of 2123 Items    << < 23 24 25 26 27 28 29 30 31 32 > >> 
Thumbnail
Title
Description
Dates
Label on verso: WORK PROJECTS ADMINISTRATION, M-9; STATE OF WASHINGTON; Date: 3/4/41; OP No. 65-2-93-146; Zone 1; Photo by Morgan Fitz, Camp Kettle; Title: Columbia Basin Clearing Project; Caption: Hawk Creek Bend. One of the widest points of the...
2024-11-22
Bucket, at toe of dam, under construction east of block 40.
1936-08-28
2024-11-22
South end of "Ice Dam" gorge ; frozen dam in upper right corner.
1936-11-12
2024-11-22
Erecting an interlocking steel pile cell in connecting wood plug in block 40 with cluster "G" in west cofferdam prior to river diversion.
1936-09-01
2024-11-22
The indolent manner in which these highscalers are draped over their tools indicates experience rather than indifference. in the hands of a novice a jackhammer seems to be a wild and raving tool, filled with perverse notions and quirks,...
2024-11-22
View of the upstream face of the dam, showing the drum gates in the spillway section.
1941-05-16
2024-11-22
Looking west - passages in foreground for river diversion; part of bucket at toe of dam; the west training wall; penstock forms for left power house; and high trestle running to Westmix
1936-11-01
2024-11-22
West side of block "40"; High trestle in upper right.
1936-07-15
2024-11-22
Excavation in upstream end of diversion channel - behind sections "C" and "D" of west cofferdam.
1936-08-01
2024-11-22
Placing a steam hammer for driving piles in cofferdam cell connecting section "G" with block 40, prior to river diversion.
1936-08-01
2024-11-22
The indolent manner in which these highscalers are draped over their tools indicates experience rather than indifference. in the hands of a novice a jackhammer seems to be a wild and raving tool, filled with perverse notions and quirks,...
2024-11-22
South end of west cofferdam being removed by sluicing fill through holes out in the steel walls. West-mix in the distance.
1936-08-08
2024-11-22
Longitudinal gallery, 900 elevation, with supply and return headers for cooling system.
1936-08-01
2024-11-22
Steam Hammer (3-1/2 foot-ton) driving interlocking steel piles in west cofferdam cell.
1936-08-01
2024-11-22
Excavation equipment on the east side.
1935-08-01
2024-11-22
Clamshell loading barge with material removed from cofferdam cribbing in the spillway bucket section at blocks 39 and 40. The loaded barge is then towed into midstream, and the material dozed overboard with a Caterpillar tractor.
1938-02-09
2024-11-22
Equipment removing section "H" of west cofferdam.
1936-12-11
2024-11-22
Shore-end of timber cribs in downstream cross-river cofferdam.
1936-08-28
2024-11-22
East end of high trestle. Snow covers east abutment rock.
1937-02-17
2024-11-22
Removing fill in cells of section "H" west cofferdam, by sluicing it through openings out in the steel walls.
1936-07-01
2024-11-22
Here in April of 1937 jackhammer crews are removing the first layer of bedrock in the excavation pit east of block 40. Note the vertical keyways on the side of block 40, which was typical of all blocks. The blocks were interlocked with these...
1937-04-01
2024-11-22
View of the river side of the upstream cross-river cofferdam directly upstream from block 40.
1937-04-01
2024-11-22
Excavating in bedrock west of block 40. Steel piling in section "D" of west cofferdam to the right.
1936-05-01
2024-11-22
Two-story government garage, completed. A concrete tower for use in draining and drying fire hose is included.
1942-07-01
2024-11-22
The downstream face of the dam, the left powerhouse, the spillway at flood stage, and the Columbia River Reservoir in a general view from the left or west side. The floating debris caught by the log boom will be beached and burned.
1940-06-03
2024-11-22
676 - 700 of 2123 Items    << < 23 24 25 26 27 28 29 30 31 32 > >> 

© Western Waters Digital Library - GWLA member projects - Designed by the J. Willard Marriott Library - Hosted by Oregon State University Libraries and Press