Letter: From Jack H. Vaughn, to Stewart Udall, April 27, 1965 (carbon copy)
1965-04-27
2006-09-16 |
Memorandum: Memorandum of Understanding As to Functions and Obligations of Agencies to the United States in Carrying Out the International Agreement with Mexico in Minute No.218, Recommendations to the Colorado River Salinity Problem, April 26,...
1965-04-26
2006-09-16 |
Document: "Essential Provisions of a Minute Between the U.S. and Mexico," October 14, 1964 (photocopy), page 3
1964-10-14
2006-09-14 |
Memorandum: From Secretary of the Interior and Secretary of State, "Solution to Salinity Problem associated with delivery of Colorado River water to Mexico under Treaty of February 1944", draft 12/1/64, page 3
1964-12-01
2006-09-14 |
Document: "Estimate of winter flow of Colorado River to Mexico excluding Wellton-Mohawk Drainage Waters," Draft 12/12/64 (photocopy)
1964-12-12
|
Document: Minute No. 218, "Practical Solution of the Colorado River Salinity Problem," 1/9/65 (thermofax), page 3
1965-01-09
2006-09-14 |
Letter: From Orren Beaty, to William P. Copple, September 22, 1964 (carbon copy), page 1
1964-09-22
|
-8-
irrigated acreage of the Mexicali Valley. Since the initiation of pumping at Wellton-Mohawk, the drainage system in the Mexicali Valley has not been able to carry off all of the heavy salt concentrations in the water.
Inasmuch as the...
|
CARL HAYDEN, ARIZ., CHAIRMAN
RICHARD B. RUSSELL, GA. STYLES BRIDGES, N.H.
DENNIS CHAVEZ. N. MEX. LEVERETT SALTONSTALL. MASS.
ALLEN J. ELLENDER, LA. MILTON R. YOUNG. N. DAK.
LISTER HILL, ALA. KARL E. MUNDT. S. DAK.
JOHN L. MCCLELLAN. ARK....
|
-4-
III Tentative Findings on the Wellton-Mohawk district
1. There are about 90,000 acres in the projects of which some 75,000 are to be used for farming. Soil tests in the district show that the salt content of the soil in the 60,000 acres...
|
to export the remaining unused waters out of the Colorado River watershed to adjoining river valleys such as the Arkansas and the Rio Grande. How they expect adequate or feasible hydro-electric power to be made in the future at dams whose...
|
Preliminary Report of the
Bureau of Outdoor Recreation on the
Pacific Southwest Water Plan
The construction of major reservoirs of the proposed Lower Colorado River Project would create areas that would have a considerable potential for...
|
Completion of a Definite Plan Report is now scheduled for
1961. Construction could commence as soon as funds are appropriated
by the Congress. This small project could be completed in
two to three years after the start of construction.
b. Lyman...
2008-11-01
|
18
PUBLIC WORKS APPROPRIATIONS, 1962
State and project Revised budget estimate for fiscal year 1962 Allocation
Construction Planning Construction Planning
Missouri-Continued
Mississippi River between the Ohio and Missouri Rivers-regulating...
|
Miscellaneous discharge measurements in the Santa Margarita river drainage basin during the year end by the Department of Interior United States Geological Survey with the corresponding date, stream, locality and discharge (in feet/second).
1914-08-01
|