Record Details

page 323

Digital Collections at BYU

Field Value
Title page 323 Central Utah Project, Bonneville Unit : Diamond Fork Power System : final Environmental Impact Statement, page 323
Coverage Electronic reproduction;
Format 323 text/PDF
Rights Brigham Young University; http://lib.byu.edu/about/copyright/generic.php Public Domain Public
Language English; eng; en
Relation Central Utah Project; Western Waters Digital Library; consultation AND coordination continued response see the response to comment no 178 182 comment it is not clear in the DEIS as to whether the section 404r would also cover the proposed transmission lin lines iines es outside of the diamond fork drain age if this is intended we do not feel that 404r is appropriate as the proposed transmission lines outside of the diamond fork drainage have not been evaluated response the corps of engineers 404r exemption was intended to cover only proposed transmission lines within the diamond fork drainage should the fifth water pumped storage alternative be selected and permits be required for construction of these lines western would be responsible for compliance with the clean water act 183 comment pages 99 99101 101 lol iol discusses alternatives to provide transmission and distri bution aution facilities for power that will be generated by the project the general types of environmental impacts that can be expected are addressed and it is stated page 209 that implementation of western area power administrations standard mitigation procedures listed in attachment 3 would in most cases avoid impacts to wildlife habitat however page 204 states that it is not possible at this time to identify specific corridors or impacts relating to the needed transmission system modifica tions eions since the transmission system is a part of the diamond fork power proj broj ect act we feel that impacts should be investigated by our service in cooperation with other involved state and federal agencies under author ity of the fish and wildlife coordination act until such time that the impacts are quantified and acceptable mitigation plans are assured exemption for corps of engineer permits in accordance with section 404r for the transmission system is not appropriate response see response to comment no 182 184 comment page 164 table 45 at the minimum pool elevation with the fifth water and sixth water pumped storage alternatives the increase in standing crop lb I byear year should be 810 rather than 870 similar corrections should also be made in the first and third paragraphs on page 165 323
Identifier http://cdm15999.contentdm.oclc.org/cdm/ref/collection/WesternWatersProject/id/2832

© Western Waters Digital Library - GWLA member projects - Designed by the J. Willard Marriott Library - Hosted by Oregon State University Libraries and Press