Note on album leaf: Night at Grand Coulee.

In the distance on the east side of the river is Mason City, the contractors electrified camp.

PH Coll 239.26

Drilling at the heading of the Snow Lakes Tunnel.
2024-11-24
the President in his 1932 Portland speech. Ross believed that the public should have an opportunity to express its sentiments on rates. He stated: "Bonneville Dam belongs to the whole Northwest. It is the property of all the people, and I am...

Label on verso: US WPA 536

WASHINGTON STATE WORKS PROGRESS ADMINISTRATION; Date taken April 19th, 1939. Zone; County; City; COLUMBIA RIVER CLEARANCE PROJECT. Descriptive Caption. "Moving Camp Ferry". Toilets...
2024-11-24
Caption on image: WPA Preparing Marcus house for burning. While a WPA clearing crew in the background works about a house in too poor condition for moving or salvage which was purchased by the Bureau of Reclamation and later turned over to the WPA...
2024-11-24
Caption on verso: Grand Coulee Dam, Govt. Engineers' camp in foreground. G. Asahel Studio, 1942.

[Grand Coulee Dam 487]
2024-11-24
The community of trophically transmitted marine parasites of juvenile coho (Oncorhynchus kisutch) and Chinook (Oncorhynchus tshawytscha) salmon across 8 years (2002–2009) was related to indices of physical and biological ocean conditions and adult...
2014-11 (iso8601)
In April of 1938 drilling and blasting of rock on the upper part of the east abutment was started. From these abutment areas workmen drilled, blasted, and barred down thousands of tons of weathered and loose rock. Excavation of the rock for the...
1938-04-01
2024-11-24
Quercus garryana dominated plant communities are found in the interior coastal valleys and on foothills from southeastern Vancouver Island, British Columbia, south to San Francisco, California. They occur as savannas, intermixed with a variety of...
1963-10-14 (iso8601)
Jackhammer crews are here shown working on final bedrock just east of block 40. The buttress wall in the background contains 3,000 cubic yards of concrete, and was rushed to completion as a continuous pour in a week's time. It was placed to...
2024-11-24
The indolent manner in which these highscalers are draped over their tools indicates experience rather than indifference. in the hands of a novice a jackhammer seems to be a wild and raving tool, filled with perverse notions and quirks,...
2024-11-24
Document: Pacific Southwest Water Plan- Proposed Draft Letter of Transmittal- Secretary to the President, December 1963, page 12
1963-12-01

mated, from experience curves, to be $9,359,600. For replacement, the estimated annual cost is $5,276,300. These annual production costs are presented by individual projects in a table at the end of this chapter. Transnzis

106-page report, but lacks Chapter 2; Abstract: Cultural resources investigations were conducted at two sensitive areas and fourteen sites along the Rocky Reach Reservoir for the Chelan County Public Utility District No. 1 of Wenatchee,...
1992-02-01
A calculation of the amount the Colville Tribe should be paid for annual use of their land by the Douglas County (Wash.) Public Utilities Commission for the Wells Hydroelectric Project (44 pages)
2003-01-15
The virulence of selected isolants of infectious hematopoietic necrosis virus (IHNV) were differentiated and correlated with electrophoretic mobilities of virion structural proteins by sodium dodecylsulfate polyacrylamide gel electrophoresis. A...
1989-05-05 (iso8601)
Memorandum: From Orren Beaty, to Stewart Udall, "Re: California Trip and Pacific Southwest Water Plan," December 31, 1964