Record Details
Field | Value |
---|---|
Title | page 338 |
Relation | Columbia River |
Date | 2005-02-22 to 2005-04-11 |
Rights | This item is in the public domain. Acknowledgement of the University of Oregon Libraries as a source is requested. |
Type | page |
Format | Scanned from originals using Silverfast AI 6.0 on UMAX Powerlook III flatbed scanner. Scanned images saved as 16 bit grayscale tiffs. 233.446 kb 8 bit - Gray Gamma 2.2 - greyscale Omnipage 14 used to OCR 8 bit grayscale tiffs and generate text files for full text access. 16 bit grayscale tiffs edited in Photoshop 6.0: cropped, rotated, reduced in size, levels adjusted, bit depth reduced to 8 and JPEGs created. |
Description |
mated, from experience curves, to be $9,359,600. For replacement, the estimated annual cost is $5,276,300. These annual production costs are presented by individual projects in a table at the end of this chapter.
Transnzis |
Identifier | http://oregondigital.org/u?/wwdl,1792 |