Receiving weekly pay checks at contractor's office.
1936-07-07
2024-11-22
Shore-end of downstream cross-river cofferdam.
1936-09-01
2024-11-22
Stripping at Brett gravel pit, using two LeTourneau 6-yard scrapers with a Caterpillar 75.
1935-05-24
2024-11-22
Blockouts completed for the elevation 934 outlet works conduit gates by the Mason-Walsh-Atkinson-Kier Company. They are 26'-10" x 30' in size, with floor elevation at 917.5 and the top at elevation 975. Due to the inability of the Hardie-Tynes...
1937-01-24
2024-11-22
Diversion channels through the dam, showing floe ice floating in river.
1937-01-07
2024-11-22
Westmix concrete plant.
1936-06-01
2024-11-22
Building a barge on east side. The town "Coulee Dam" across the river
1936-09-01
2024-11-22
The westmix concrete plant. Unloading level is at 1024, elevation of high trestle on the left. At the right is shown the skip transfer arrangement to low trestle, elevation 950.
1935-11-30
2024-11-22
Wood Gantry for six hammers in pile driving on west cofferdam
1935-03-08
2024-11-22
Grand Coulee Power Plant Left Switchyards-elec. Installation switching diagram.
1944-02-12
2024-11-22
Construction of the Pumping Plant Structure, Grand Coulee Dam, Coulee Dam, Washington. Installation of pumping unit P-2 discharge pipe, showing reinforcing steel being placed in concrete form is the square opening of the block out which extends...
1949-05-16
Excavation at dam site - looking east.
1934-04-02
2024-11-22
Note on album leaf: Concrete placing. January 1936. Top of dam 280 ft. above high trestle deck.

PH Coll 239.21
2024-11-22
Note on album leaf: Bedrock behind west cofferdam.

PH Coll 239.24

Timber trusses between steel piling diaphragms in excavation for block 40.
1935-11-30
2024-11-22
Third Volume, Forty Seventh issue, of the Mason-Walsh-Atkinson-Kier CO. builders of Coulee Dam Safety Newsletter. Created by the Safety Department and issued to the residents of Mason City and contract workers at Grand Coulee Dam.
2024-11-22
2024-11-22
Note on album leaf: Concrete in dam, June 1936. One millionth yard placed. Aug. 14, 1936.

PH Coll 239.22
2024-11-22
A rock crew working on the pumping plant foundation. A general program of blasting and excavating a successive series of benches, the back wall of which was trimmed to the specified slope of 1/4 to 1, was followed.
1938-07-26
2024-11-22
Note on album leaf: Below river. Drillers safe from surging waters behind a protecting cofferdam

PH Coll 239.46

This view from the west wall of the Coulee, with the southwestern part of the Hartline Basin in the background, shows the remains of the great flood channel cut as the torrent rushed toward the narrow outlet of the Hartline Basin to the right....
2024-11-22
Third Volume, Forty Fifth issue, of the Mason-Walsh-Atkinson-Kier CO. builders of Coulee Dam Safety Newsletter. Created by the Safety Department and issued to the residents of Mason City and contract workers at Grand Coulee Dam.
2024-11-22
2024-11-22
Third Volume, Thirty Seventh issue, of the Mason-Walsh-Atkinson-Kier CO. builders of Coulee Dam Safety Newsletter. Created by the Safety Department and issued to the residents of Mason City and contract workers at Grand Coulee Dam.
2024-11-22
2024-11-22
Upstream view of dam and elevation 1024 trestle. Suspension bridge with its center tower. Lower end of diversion channel in lower right corner. Down-stream cross-river cofferdam has been removed.
1937-12-21
2024-11-22
Department of the Interior: Bureau of Reclamation; Columbia Basin Project-Washington Grand Coulee Dam - Organization Chart May 1934
1934-05-01
2024-11-22
"What I did Would Have Cost Buillions"

2024-11-22
626 - 650 of 2123 Items    << < 21 22 23 24 25 26 27 28 29 30 > >> 

© Western Waters Digital Library - GWLA member projects - Designed by the J. Willard Marriott Library - Hosted by Oregon State University Libraries and Press