Letter: To Richard Feeney, from F.J. Flynn, July 15, 1966 (thermofax)
1966-07-15
|
Document: Statement presented by Senator Len B. Jordan To Senate Irrigation and Reclamation Subcommittee During Hearings on Central Arizona Project (S. 1658) In discussion of Pacific Southwest Water Plan, April 17, 1964, page 2
1964-04-17
|
mines, from the standpoint of numbers of persons employed, and the principal minerals produced from them are indicated on the accompanying map.
The need for strategic minerals in the war effort stimulated production of mercury in Valley and...
|
drainage water in the winter time because of (3) above, and thus reduce Arizona' allotment for consumptive use under the anticipated Supreme Court decision, (2) above. The proposal by the United States Panel that additional wells and a bypass...
|
evolved the Snake-Colorado Project, which is recommended as a substitute proposal for part of the Pacific Southwest Water Plan.
This substitution will result in a substantial scaling down in the size and cost of both the first and second phases...
|
Image captions: Looking east across city of Portland, Oreg., to Mount Hood. Cargo of lumber out-bound down the Willamette River, Portland, Oreg.
|
Third, if collaboration in these efforts is a priority, it needs to be translated into clear and consistent federal participation. There should be no illusion that this will be easy. Even at the federal, inter-agency level, this poses a formidable...
|
Table 1 110
State Idaho
Montana Nevada Oregon Utah Washington Wyoming
Percent of water
47.6 17.1 1.0 12.9
15.3 6.1
Percent of population
9.4 9.5 2.5
24.5 11.8 38.3 4.0
The upstream-downstream dynamic was hard to miss: Water...
|
A steel span of the Marcus bridge just leaving its position, in transit to dam. The two-deck barge is the workmen's living quarters. The tug,"Blue Ox,; is shown in rear of the house boat.
1942-02-19
2024-11-06 |
luggage aft. Half-inflated, the rubber-lined jacket was no handicap in rowing, and the tube hung ready to receive more air if necessity arose. As for the trim, it had been my snap judgment at the last moment that it would be better to give the...
2004-08-23
|
SAINT HELENS BAR FROM SURVEY OF SEPTEMBER 1884.
Showing adopted System of Dikes and part built to June 30th 1885.
Improvement of the Columbia and the Willamette River
Soundings are in feet reduced to low water. Circles enclosing figures...
|
Image Caption: TABLE MOUNTAIN, BACKBONE OF CASCADE RANGE --page break-- that time Mount Adams on the north, and Mount Hood on the south were active volcanoes, and were considered to be the abode of two great gods. These gods became angry and...
2004-07-20
|
The writer of this report has been assigned the task of preparing information for the navigation and flood control subprojects, the latter being the subject of this report. The objectives of the flood control study are: 1. To determine the flood...
1970-02-01
|
House of Representatives may well decide the fate of Bruce's Eddy dam and other Columbia Basin
1962-10-10
|
CHAPTER XIII
FROM KINBASKET LAKE TO THE FERRY On August 5, about midday, I noticed two Peter-borough canoes, each with an occupant, coming down the lake from the south. As they came nearer I saw that the man in the larger canoe was Emond, and...
2004-07-12
|
Fifty-foot high, four decked jumbo drill rig that will be used to bore the diversion tunnel at the U.S. Army Corps of Engineers' Dworshak Dam on the North For Clearwater River. Thirty air-driven "Swedish ladder drills" will be distributed along...
1965-11-06
|
Men remove rock on steeper section of the river bank.
1938-07-26
|
View of the river, and a large section of the bank, which has been excavated.
1934-06-29
|
Bridge pier repairs. Inside caisson (interlocking piles) showing top rows of 36-inch I-beam walers and timber bracing.
1936-01-30
2024-11-06 |
V. COMMENTS BY OTHER AGENCIES
Page
A. Corps letter to agencies plus mailing list V-2
B. Responses
Atomic Energy Commission V-6
Bonneville Power Administration V-ll
Bureau of Indian Affairs V-38
Bureau of Land Management V-39
Bureau...
|
Center tower of conveyor suspension bridge. Top arm 180 feet long. Spans on either side, 1437 feet long.
1936-08-01
2024-11-06 |
Swinging "pendulum" boom conveyor, 200 feet long, hopper and five-yard shovel of a lateral to collecting conveyor at the 1840 level in Brett pit. In upper part is similar set-up.
1936-09-01
2024-11-06 |