Results

426 - 450 of 903 Items    << < 13 14 15 16 17 18 19 20 21 22 > >> 
Thumbnail
Title
Description
Dates
ESTIMATED CONSTRUCTION COSTS [Thousands of dollars] Project Irrigation distribution cost Dam and reservoir NameCost Total cost Dayton 150 Dayton 2,350 2,500 Tilton-Freewater 200 Milton 2, 800 10, 000 Bear Creek 7,000 Walla...

Management of the water resources of the Methow River Basin is changing in response to the listing of three species of fish under the Endangered Species Act and the Washington State-legislated watershed-planning process. Management options must be...
2024-11-22
Management of the water resources of the Methow River Basin is changing in response to the listing of three species of fish under the Endangered Species Act and the Washington State-legislated watershed-planning process. This report describes the...
2024-11-22
by clay and commonly known as "alkali" depressions which are contained within these lands, however, materially impair their agricultural value. In other localities the lands are quite rolling, and the soils are light-brown, gravelly loams of...

A precipitation-runoff model for the Methow River Basin was used to simulate six alternatives: (1) baseline of current flow, (2) line irrigation canals to limit seepage losses, (3) increase surface-water diversions through unlined canals for...
2024-11-22
Colonel A. R. Marshall April 3, 1974 Page Two 5A-2 - Problems relating to specific reservoirs should be brought to attention of CCJP management staff if found to be not within the purview of CR&T. 5B-1 [combining with 5-Al] Work on this...

Enclosure 1 - Review of Existing Columbia River System 1A1 Add F-11 under source lA8 Add F-ll under source (Continue this addition as applicable for following remarks.) lBl Comment: USBR has undertaken total water management studies in the...

PACIFIC NORTHWEST RIVER BASINS COMMISSION 1 Columbia River Vancouver, Washington 98660 OFFICE OF THE CHAIRMAN April 3, 1974 P. O. Box 908 Telephone (206) 694-2581 (503) 285-0467 Colonel A. R. Marshall Deputy Division Engineer...

Indian Rapids. The Indian Rapids site (No. 564) is located adjacent to the Columbia River just east of the mouth of the John Day River (Subregion 7E). The upper reservoir would be located on a bluff, about 1000 feet above Lake Umatilla, the...

wildlife conservation, recreation, and silt control may be made when further investigations have been completed. Reimbursable allocations noted herein would be reduced by the amount of such additional nonreimbursable costs. With respect to...

PALMER LAKE RES. SITE CHELAN KETTLE RIVER PROJECT SANPOIL RIVER PROJECTS OKANOGAN RIVER PROJECTS FOSTER CR PROJECTS. FOSTER CR. POWER SITE CHELAN RIVER PROJECTS ENTIAT RIV. PROJ WENATCHEE LAKE RES. SITE GRAND COULEE POWER SITE...

Letter from the Bureau of Reclamation Branch of Operation and Maintenance to W. E. Code explaining the Bureau's policy for making contracts with water users and two sample contracts for the Yuma Project and the Westland and Stanfield Irrigation...

2017-07-12
2017-07-12
reimbursable funds permissible under current standards developed by the War Department for achieving benefits of the value estimated. The estimate, however, does not include any consideration of benefits to recreation and to fish and wildlife....

Problem or Area of Concern PI-21 F-11, 19 Source SI-33, 50 I-2 W-6 F-9, 19 Tentative Disposition C C C. Policy Problems, Programs, etc. 1. Investigate new means of supplying water to crops. Conserve water by reuse. Investigate need...

is of greater relative importance than in any other subdivision of the basin. Fruit production is particularly significant in the irrigated sections, where it accounted for nearly two-thirds of the total value of crops sold or traded in 1939....

Document: "Snake-Colorado Project, A Plan to Transport Surplus Columbia River Basin Water to the Arid Southwest", October, 1963, page 5
1963-10-01

laws, agreements and projects play an enormous part in this structure, it would be misleading to say that the river had been federalized. In addition to non-federal development in the Mid-Columbia, the Coordination Agreement is a contract whose...

thin mattress spread on the ground or a hard board floor was decidedly pleasant. In the morning Mr. Boyle invited me to breakfast, and filled me up with bacon, hot griddle cakes with butter and syrup, and coffee. The town of Marcus is across the...
2004-07-19
Document: Statement presented by Senator Len B. Jordan To Senate Irrigation and Reclamation Subcommittee During Hearings on Central Arizona Project (S. 1658) In discussion of Pacific Southwest Water Plan, April 17, 1964, page 5
1964-04-17

APPENDIX 2 I. Prospective Power Sites, Columbia River Basin. 2. Electric Power Requirements for Irrigation Pumping on Potential Projects Columbia River Basin. Prospective power sites 1—Columbia River Basin Stream Power site Firm...

1 map ; negative, 18 x 34 cm. Gravity Project Area, Pumping Project Area, and Boundary of watershed above Albany Falls all marked by differentiated shading Before the arrival to Washington State of the first irrigation projects handled by the...
2024-11-22

1 map ; 30 x 31 cm. Relief shown by hachures. Broken lines indicate boundaries of proposed irrigation districts in western Idaho, northeastern Oregon, and southeastern Washington. Includes rivers, creeks, lakes, mountains, railroads, and cities....
1890-11-22

tional parks and national monuments, under the jurisdiction of the National Park Service. The other type embraces the camp grounds and other recreational areas within the national forests administered by the United States Forest. Service....

426 - 450 of 903 Items    << < 13 14 15 16 17 18 19 20 21 22 > >> 

© Western Waters Digital Library - GWLA member projects - Designed by the J. Willard Marriott Library - Hosted by Oregon State University Libraries and Press