Record Details

Statement Presented by Senator Len B. Jordan to Senate Irrigation and Reclamation Subcommittee During Hearings on Central Arizona Project

University of Arizona CONTENTdm Server Respository

Field Value
Title Statement Presented by Senator Len B. Jordan to Senate Irrigation and Reclamation Subcommittee During Hearings on Central Arizona Project
Description Document: Statement presented by Senator Len B. Jordan To Senate Irrigation and Reclamation Subcommittee During Hearings on Central Arizona Project (S. 1658) In discussion of Pacific Southwest Water Plan, April 17, 1964, page 5 - 5 - average annual basin runoff. (7) Floods occur on the Columbia River in late spring and early summer. (8) About 22 billion kilowatt hours of low grade secondary power is presently available in the BPA system during the time that river flows are the highest. (9) The combination of surplus flood water and surplus energy presents the same challenge that is so well demonstrated by the irrigation pumps which lift water from Roosevelt Lake to Grand Coulee storage for delivery to... Epson Perfection 4870 Photo, 400 dpi, 8 bit, 1,054,857 bytes
Creator Jordan, Len B.
Date 1964-04-17 2006-9-22; 2006-09-23
Type text
Format image/jpeg
Identifier su03482.jpg http://server16127.contentdm.oclc.org/u?/udallcoloradoAZU,8620
Source Az 372 Box 167, Folder 9
Language eng

© Western Waters Digital Library - GWLA member projects - Designed by the J. Willard Marriott Library - Hosted by Oregon State University Libraries and Press