Browse by Archive

Washington State University Libraries

View Archive Info

Dumping a 4-yard concrete bucket in a form near the high trestle.
1936-05-19
2024-11-25
Concrete blocks and high trestle bents west of spillway section.
1936-05-22
2024-11-25
Unloading a four-yard concrete bucket in a standard five-foot pour. Vibrator on extreme left.
1936-05-01
2024-11-25
Typical blocks of concrete in the dam. Bents in upper part support high placing trestle.
1936-05-01
2024-11-25
Cantilever and Whirley-type crane assembly on the two concrete placing trestles.

2024-11-25
Typical block being prepared for a five-foot "lift" of concrete - note cooling pipes on top.
1936-05-26
2024-11-25
The 5' x 7' transverse gallery in block 22, elevation 900, looking upstream.
1936-05-22
2024-11-25
Reinforcing in base of east training wall.
1936-05-26
2024-11-25
Skip-way arrangement for transferring concrete to lower placing trestle, elevation 950 west end.
1936-06-01
2024-11-25
Dumping sand for block cleaning through trestle deck.
1936-06-01
2024-11-25
Looking west, block 31 in near foreground - high and low trestles, conveyor bridge and Westmix, cantilever and whirley cranes. Part of Smith Valley gorge in foreground.
1936-06-08
2024-11-25
West abutment, showing mixing plant, entrance of aggregate conveyor at top and the two placing trestles below ; reinforcing steel in west power house foundation.
1936-06-16
2024-11-25
West end of dam between the two placing trestles ; forms for penstock block-outs in left foreground. Block 40 and west cofferdam in the distance.
1936-06-26
2024-11-25
Looking west across the dam. Block 31 in foreground, high and low placing trestles distance. Suspension bridge for aggregate in upper right corner.
1936-06-26
2024-11-25
Looking west from Smith gorge - blocks are from No. 31 to abutment. high and low trestles, and Westmix.
1936-06-26
2024-11-25
Dumping concrete from a 4-yard bucket through floor on west end of 950 elevation trestle.
1936-06-26
2024-11-25
"Elephant trunks" used in placing concrete in power house walls.
1936-06-01
2024-11-25
Looking west - on bedrock, toward block 31. Elevation 1024 trestle to the right.
1936-07-01
2024-11-25
Concrete placing trestle (1024 elev. from block 33 west; and the 880 and 900 galleries in block 31.
1936-07-01
2024-11-25
Lower end of concrete transfer skip to lower trestle on west side.
1936-07-01
2024-11-25
Forms and steel for 24-foot octagonal block-outs for 18-foot diameter steel penstocks in left power house. Low placing trestle (950 elev. in upper left.
1936-07-06
2024-11-25
Block 11-A showing section of 900 elevation gallery form, and in lower right a portion of grouting and drainage gallery. Upright pipes in block are 5-inch porous drain pipes.
1936-07-13
2024-11-25
Bents in "high" placing trestle - 36-inch I-beam columns.
1936-07-15
2024-11-25
West side of block "40"; High trestle in upper right.
1936-07-15
2024-11-25
Reinforcing steel at elevation 900 in west training wall.
1936-07-01
2024-11-25
1526 - 1550 of 2531 Items    << < 57 58 59 60 61 62 63 64 65 66 > >> 