Results

1476 - 1500 of 1519 Items    << < 55 56 57 58 59 60 61 > >> 
Thumbnail
Title
Description
Dates
Edge of Mount Garfield just visible at right. Two-wheeled farm implement parked in field at center of image. Note on envelope reads, "Grand Junction Indian School Drainage Project, Nov 1916." The Grand Junction Indian School was also known as the...
1916-11-01
2016-12-05
2016-12-05
6,300 acres of project lands. Drainage facilities will also be built. Flood control and fish and wildlife values will be improved. The proj ect includes 6,300 acres of new land and 12,650 acres of presently irrigated land needing a supplemental...
2008-11-01
Document: Pacific Southwest Water Plan "Printed Copy" Chapter II, August 26 ,1963 page 14
1963-08-26

and as these land uses intensify, the water situation will become more critical. Expanding range, wildlife, recreation, and agricultural uses, as well as urban development, will strain local water sources on the public lands. Better management of...
2005-08-30
Letter: From Nicholas deB. Katzenbach, Deputy Attorney General, to Kermit Gordon, Apr 3, 1964, page 2
1964-04-03

Cutler Reservoir is located in Cache county, Utah and was created for the purposes of irrigation, water storage and flood control. High nutrient loading to Cutler has raised concerns about the health of this system and has resulted in it being...
2009-01-01
Wooden crate on ground near building. Note on envelope reads, "Grand Junction Indian School Drainage Project, Nov 1916." The Grand Junction Indian School was also known as the Teller Institute.
1916-11-01
2016-12-05
2016-12-05
COLORADO RIVER STORAGE PROJECT 27 and the participating projects. The Secretary's report shall be prepared to reflect accurately the Federal investment allocated at that time to power, to irrigation, and to other purposes, the progress of return...
2009-12-01
Parshall flume visible near road
1951-10-01
2016-12-05
2016-12-05
Columbia Basin Project, Irrigation Division, Soap Lake Siphon, Specifications 2411. This photograph shows the sump of the gravel trap and the partially constructed open inlet transition. The gap between the concrete and the circular re-steel is...
1950-05-09
Columbia Basin Project, Irrigation Division, East Low Canal, Specifications 1422, Utah Construction Co. and Winston Bros., Contractor. Looking east across the Broken Rock Siphon No. 1 showing the completed barrel section and construction of the...
1949-08-04
acre-feet for the Pacific Southwest area from surplus water supplies on the Lower Eel River in the North Coastal Section of California. This additional aqueduct enlargement needs to be included initially to permit its construction as an...
1476 - 1500 of 1519 Items    << < 55 56 57 58 59 60 61 > >> 

© Western Waters Digital Library - GWLA member projects - Designed by the J. Willard Marriott Library - Hosted by Oregon State University Libraries and Press