The elevation 1024 construction trestle, used by the M.W.A.K. Company, was dismantled by the new contractor.
1938-05-10
2024-11-22 |
The two camps at the dam site. In the foreground is the "Coulee Dam" the Government Camp; and across the river is "Mason City" the contractor's camp.
1936-08-26
2024-11-22 |
Ten 5,000 barrel steel silos of the cement storage and blending plant - air compressor plant at the left.
1935-09-26
2024-11-22 |
Five-yard shovel loading a 15-yard buggy in west tailrace area.
1935-06-24
2024-11-22 |
Drilling weathered rock at top of foundation, east end of dam.
2024-04-22
2024-11-22 |
Placing timber cribs in east end of upstream cross-river cofferdam. Abutment of west end of coffer is steel cell in west cofferdam shown to the left.
1936-09-09
2024-11-22 |
Sand dewatering rakes at aggregate processing plant, Brett pit.
1935-09-03
2024-11-22 |
Seventy-five ton trailer truck moving a 300 horsepower boiler.
1935-05-27
2024-11-22 |
36-inch Glyx drill hole in west bedrock.
1935-09-25
2024-11-22 |
Stripping at Brett gravel pit, using two LeTourneau 6-yard scrapers with a Caterpillar 75.
1935-05-24
2024-11-22 |
Grand Coulee Power Plant Left Switchyards-elec. Installation switching diagram.
1944-02-12
2024-11-22 |
Construction of the Pumping Plant Structure, Grand Coulee Dam, Coulee Dam, Washington. Installation of pumping unit P-2 discharge pipe, showing reinforcing steel being placed in concrete form is the square opening of the block out which extends...
1949-05-16
|
Blockouts completed for the elevation 934 outlet works conduit gates by the Mason-Walsh-Atkinson-Kier Company. They are 26'-10" x 30' in size, with floor elevation at 917.5 and the top at elevation 975. Due to the inability of the Hardie-Tynes...
1937-01-24
2024-11-22 |
Diversion channels through the dam, showing floe ice floating in river.
1937-01-07
2024-11-22 |
Building a barge on east side. The town "Coulee Dam" across the river
1936-09-01
2024-11-22 |
The westmix concrete plant. Unloading level is at 1024, elevation of high trestle on the left. At the right is shown the skip transfer arrangement to low trestle, elevation 950.
1935-11-30
2024-11-22 |
Wood Gantry for six hammers in pile driving on west cofferdam
1935-03-08
2024-11-22 |
This is a diamond drill rig in operation. A compressed-air motor rapidly spins the hollow shaft, down which water is forced to cool the bit, and carry away the cuttings. The core specimen rises in the hollow drill stem as the bit cuts downward....
2024-11-22
|
A closure gate moves slowly into position. When rollers of the gate are placed against the roller path guide frame (the truss of which is visible); the derrick will lower the gate, thereby cutting off the river flow through this diversion channel....
2024-12-22
2024-11-22 |
Cells in section "E" of west cofferdam with filling partly removed - looking downstream.
1936-08-28
2024-11-22 |
Excavating on east side behind south end of Wakefield cofferdam. Material transported by 90-inch conveyors across river on trestle to main conveyor running to Rattlesnake Canyon.
1936-10-01
2024-11-22 |