6/2/64 draft.
Be it enacted by the Senate...
That the Secretary of the Interior is hereby authorized and directed to construct and operate a channel and associated works to convey drainage effluent from the Wellton-Mohawk Project in Arizona to a...
|
about 11,300 gross acres, of which about 10,300 were irrigated in 1962. Included in this study area were drainage wells discharging water of high salt content into the conveyance channel, as well as areas of potential high water table if the...
|
PART II. HISTORY OF IRRIGATION AND DRAINAGE
A. General
There are nine principal irrigation areas in the Colorado River basin below Hoover Dam which receive water from, and return water to, the Colorado River. These are the Valley and...
|
Reservoir now under construction. The quality of water delivered to Mexico at Morelos Dam will be comparable to that delivered as a result of Phase 2 construction.
As a supplemental and additional plan, a change in cropping pattern from alfalfa,...
|
This report evaluates the performance of a numerical model of the ground-water system in northern Utah Valley, Utah, that originally simulated ground-water conditions during
1947–1980 and was updated to include conditions estimated for 1981–2002....
2024-05-08
|
LIMITED OFFICIAL USE
-2-
The Wellton-Mohawk irrigation district in Arizona is the source of the difficulty. In total tonnage of salts, its pumps are discharging four times more salt than is received in irrigation waters. Scientific...
|
Memoradum (1 p) of project notification describing Bureau of Reclamation's tile drainage system for Deliver of Water to Mexico. Also includes cost projections and congressional districts of project areas.
1963-09-20
2005-03-22 |
WM. H. WESTOVER
J. D. MANSFIELD
WM. P. COPPLE
DOUGLAS W. KEDDIE
TOM CHOULES
WESTOVER, MANSFIELD & COPPLE
ATTORNEYS AT LAW
190 MADISON AVENUE-P.O. BOX 551
YUMA, ARIZONA
January 14, 1963
TELEPHONE
SUNSET 3-8811
IN REPLY PLEASE REFER TO
OUR FILE...
|
30 RELEASE OF COLORADO RIVER WATER in alternate' 5. It would be most dangerous if the United States committed itself at this time to these principles without having all the facts upon which to base a decision. At this time we cannot determine if...
|
The President -3- July 3, 1962
transpiration on the cropped area, This is a continuing process as the river flows downstream.
Furthermore, Mexico herself could do much that she has not done to help herself. Acreage under irrigated cultivation in...
|
With the present cropping pattern of 75% cotton and 25% winter wheat, applied to the reduced cultivated area of 407,000 acres, consumptive use of irrigation water should not be more than 1,500,000 acre feet (175,000 acre feet for 102,000 acres of...
|
pumping in view of concentrating the maintenance shutdown to the winter months. These changes in the District's drainage operations also may increase maintenance costs. Any increased costs for the new wells or annual maintenance should not be...
|