Image caption: TWIN FALLS TAKAKAW FALLS TWO GREAT CATARACTS OF THE COLUMBIA WATERSHED
--page break--
fair pay for an experienced hand. A poor boatman was worse than none at all, that is, in a pinch, while a good one might easily mean the...
2004-08-04
|
The lecturer at the Government's West Vista House displays a topographic model of the foundation upon which the dam rests.
2024-11-25
2024-11-25 |
These Montana Livestock Sanitary Board records (1907-1967)
consist of correspondence, financial records, legal documents, reports, subject files, and
miscellany for the Board, plus subgroups on foot-and-mouth disease, and...
|
Northeast Arm and Galena Bay by noon, and reached the cliff-lined shore. There had been a light head wind all morning, which retarded my progress some, but it now became a strong, steady blow which soon stirred up the waves and crested their tops...
2004-07-14
|
Columbia Basin Project, Irrigation Division, Pasco Settlers. Sowing oats on the Keith Cunningham farm, Unit 37. Looking south, highway in the distance. H. Foss, photographer
1950-04-28
|
Columbia Basin Project, Irrigation Division, Pasco Units. Showing sprinkler system on wheels, devised by Howard Hales, Unit 60. Hale is shown holding crank to a chain drive mechanism by which he can move the entire 1000 feet of pipe across the...
1950-04-28
|
Columbia Basin Project, Irrigation Division, W-3 Laterals, Specs. 2880. W-25 Lateral Station 11+84.50 State Highway #7 crossing. Workman installing 43"" Class ""D"" pipe. Work is being performed by J.A. Terteling and Sons, Inc. under Schedule 1 of...
1950-11-08
|
Main Lateral, Pasco Unit, showing agricultural development one year after the area began receiving water. Compare this photograph with a pre-irrigation picture taken from the same point. See photo 15429-3
1949-08-24
|
View showing motor grader excavating and rough trimming for asphaltic lining on Pasco Pump Lateral System at PP-7.7 Sta. 13 (2c section). This feature under construction by J.A. Tertling and Sons, Inc., 12 to 15 miles northwest of Pasco,...
1947-06-28
|
Extending elevation 1024 trestle out from concrete mixing plant on east side.
2024-11-25
2024-11-25 |
West Canal, Specs. 1286, Winston-Utah Co, Reinforcing steel jumbo in middle distance and paver farthest from the camera.
1948-04-07
|
An aerial view of the feeder canal looking west. The surface runoff chutes on the right slope of the canal in the foreground area are at stations 45+05 and 48+60, respectively. The slide cracks are visible at the left center. A good view of the...
1947-10-21
|
Columbia Basin Project, Irrigation Division, 2nd Section East Low Canal, Specs. 2603. Steel Construction Co. of Oregon, sub-contractor for J.A. Terteling and Sons. Blending machine operations. H.E. Foss, photographer.
1950-09-14
|
Columbia Basin Project, Irrigation Division, Specifications No. 2844. Third Section, West Canal, Schedule No. 1 and 2--Contractor: Marshall, Haas, and Royce, Haas and Rothschild--View showing outlet or downstream end of drainage culvert at Station...
1950-07-11
|
Columbia Basin Project, Irrigation Division, 2nd Section East Low Canal, Specifications No. 2603. Job fabricated wood burning hot water heating plant set up at jobsite in preparation for cold weather control of concrete temperatures. Water is...
1950-10-02
|
Columbia Basin Project, Irrigation Division, Soap Lake Siphon, Specifications No. 2411, Winston Brothers and Utah Construction Co., Contractors. This photograph is of the same area as photo No. 3220-04 but looking downstream. The men in the right...
1949-10-06
|
Timber plug between block 40, and steel cells in cofferdam section "G"; Preparing bedrock for block 39 in foreground - conveyor bridge in upper left.
1936-04-30
2024-11-25 |
Columbia Basin Project, Irrigation Division, Specifications No. 2324, Schedule 1, Long Lake Headworks and Concrete Canal Lining and Structures, Station 745+80 to Station 1101+29.0--Main Canal. Contractor: George B. Henly Construction Co., Inc....
1949-11-28
|
Columbia Basin Project, Irrigation Division, Specifications No. 2324, Schedule I, Long Lake Headworks and Concrete Canal Lining and Structures, Station 745+80 to Station 1101+29.0. Contractor: George B. Henly Construction Co., Inc. View of Long...
1949-09-28
|
Columbia Basin Project, Irrigation Division, West Canal. Spec. #1286--Utah Construction Co. and Winston Bros. Co. contractor. Bending reinforcing bars for Dry Coulee
1947-05-26
|
Columbia Basin Project, Irrigation Division, Specifications No. 1401, Long Lake Dam, Contractor: J.A. Terteling and Sons, Inc. A view of the completed dam from the east abutment. Long Lake Dam is 2 miles northeast of Stratford, Wa. Harold Foss,...
1949-10-11
|
Government camp looking west to Fiddle Creek Canyon.
1935-01-30
2024-11-25 |
Excavation on the west side. Trestle and catwalk in the distance.
1935-01-30
2024-11-25 |