APPENDIX UU—14EPO14T OF MAJOR HANDJiURV. 2859
to that of extreme tide and covered with grass. WJien this is done the
water will be deep and confined to well-defined channels.
We have every reason to believe that at none...
2006-06-16
|
he learned that we were not going to have to line the boat down it. Then he had one of his confounded inspirations. That portage over the reef of bedrock, with the little waterfall in the background, would photograph like a million dollars, he...
2004-08-17
|
deck" you saw the river flowing right along through the loosely stacked cordwood beneath. Roos was exultant over the way that mighty mass of rough wood charging down a rock-walled canyon was going to photograph, and Ike was proud as a peacock over...
2004-08-11
|
Despite the growing availability of high resolution topography and imagery in fluvial environments, a systematic and coherent framework for the automated derivation of geomorphic units from topography alone does not exist. Coherent morphometric...
2013-12-01
|
CHAPTER VII
II. RUNNING THE BEND Kinbasket Lake and Rapids IT continued slushing all night and most of the next day, keeping us pretty close to camp. Andy, like the good housewife he was, kept snugging up every time he got a chance, so that...
2004-08-09
|
fall, and a rough, boggy path from the eastern end of it took us to the camp of three or four comfortable cabins.
The Canadian Pacific, I learned—both on account of the high and increasing cost of its oil fuel and because of the trouble...
2004-08-09
|
Papers of a
lumber company executive, banker, and political activist in Seattle,
Washington.; Edwin Gardner Ames, lumber company executive, banker, and political
activist, was manager of the Pope & Talbot interests in the Puget Sound...
|
A portable model of the Grand Coulee Dam, built to a scale of 1 inch equals 80 feet.
2024-06-06
2024-11-06 |
This document describes the climate, vegetation, topography and drainage, geological formations (metamorphic rocks, Kittitas system, Columbia lava, clay and gravel interstratified with the Columbia lava, John Day system, river terraces, and...
1897-11-06
|
Columbia Basin Project, Irrigation Division, Pasco Settlers. Plowing scene on Unit 47, with an excellent stand of alfalfa in the background. Ken Marvin is doing the plowing, rents the farm from owner. H. Foss, photographer
1950-04-28
|
Setting one of three 16-inch gate valves on pump discharge pipes in the Burbank Pump Plant. This feature under construction about 7 miles east of Pascoe, Washington by Pfieffer and Hohner. Specifications R1-CB-16 H.E. Foss, photographer
1949-10-20
|
Columbia Basin Project, Irrigation Division, W-3 Laterals, Specs. 2880. W-25 Lateral Station 11+84.50 State Highway #7 crossing. Workman installing 43"" Class ""D"" pipe. Work is being performed by J.A. Terteling and Sons, Inc. under Schedule 1 of...
1950-11-08
|
West Canal, Specs. 1286, Winston-Utah Co. Finishers' platform following Guntert and Zimmerman paver.
1948-04-07
|
West Canal, Specs. 1286, Winston-Utah Co. Reinforcing steel crew at work, aided by truck-mounted crane on jumbo. Bridge of jumbo is a war-surplus Baily Bridge. Photo by F.B. Pomeroy.
1948-04-07
|
A 5-yard shovel excavating along the downstream toe of slope, east of block 40, at time of cofferdam leak.
1937-03-16
2024-11-06 |
View of heavy machinery digging tunnel into the bank
1938-07-26
|
Columbia Basin Project, Irrigation Division, Potholes East Canal. View showing stratification and fracturing in material in test pit at Sta. 499+00 at elevation 1028. View looks horizontally at corner behind miner in photo 2059-4 from same...
1948-09-02
|
Columbia Basin Project, Irrigation Division, West Canal, Specifications No. 1286--Utah Construction Co. and Winston Bros. Co., Contractor. Looking easterly over completed portion of Dry Coulee Siphon No. 1 from Section 172. Steel yard, where...
1948-09-15
|
Columbia Basin Project, Irrigation Division, Soap Lake Siphon, Specifications No. 2411--Utah Construction Co. and Winston Bros., Contractor. This photograph shows a "liner plate" about three quarters rolled. H.E. Foss, photographer
1949-06-27
|
F-7 B
Source 0-4
0-4
Tentative Disposition
F E
Problem or Area of Concern
18. Future recreation utilization of the relatively scarce undeveloped islands and attractive Columbia Gorge shoreline areas may be adversely affected if...
|
Upstream cross-river cofferdam in near foreground - right center is downstream coffer, both nearing completion. Suspension bridge crosses in center - west end of highway bridge is shown at the right.
1936-11-20
2024-11-06 |
Columbia Basin Project, Irrigation Division, Soap Lake Siphon, Specs. 2411. This photograph shows the left berm of the open outlet transition being excavated to original ground, preparatory to the placing of compacted backfill against the sides of...
1950-03-31
|