Record Details
Field | Value |
---|---|
Title | Construction methods and Long Lake dam--Long Lake Headworks during concrete placing [01] |
Creator | Foss, H.E. |
Date | 1949-11-28 |
Description | Columbia Basin Project, Irrigation Division, Specifications No. 2324, Schedule 1, Long Lake Headworks and Concrete Canal Lining and Structures, Station 745+80 to Station 1101+29.0--Main Canal. Contractor: George B. Henly Construction Co., Inc. View of Long Lake Headworks structure taken from left bank of intake channel looking southwest across the operation deck and service bridge. Reinforcement steel for the operation deck and electrical conduit and ground wires are in place ready for... |
Subject | Dam construction--Washington (State)--1940-1950; |
Coverage | United States--Washington--Stevens County--Long Lake Long Lake |
Source | PG 94, Box 1, Folder Construction Methods and Long Lake Dam, 4 3373 |
Publisher | University of Idaho Library Digital Initiatives, http://www.lib.uidaho.edu/digital/ University of Idaho Library Special Collections and Archives |
Relation | Columbia River Basin Project Collection http://www.lib.uidaho.edu/digital/crbp/ |
Language | eng |
Type | Image;StillImage |
Format | image/jpg |
Rights | Material produced by the United States Army Corp of Engineers. In Public Domain. For more information, please contact University of Idaho Library Special Collections and Archives Department at libspec@uidaho.edu. https://creativecommons.org/publicdomain/mark/1.0/ |
Identifier | http://digital.lib.uidaho.edu/cdm/ref/collection/crbproj/id/979 |