Record Details
Field | Value |
---|---|
Title | Construction methods and Long Lake dam--laying concrete for Long Lake Dam |
Creator | Foss, H.E. |
Date | 1949-09-28 |
Description | Columbia Basin Project, Irrigation Division, Specifications No. 2324, Schedule I, Long Lake Headworks and Concrete Canal Lining and Structures, Station 745+80 to Station 1101+29.0. Contractor: George B. Henly Construction Co., Inc. View of Long Lake Headworks structure during concrete placing in the outlet counterfort warped wall right side. Concrete is placed from the concrete bucket to small chutes in front of each counterfort. Long Lake Headworks is 2 miles northeast of Stratford, Wash. |
Subject | Dam construction--Washington (State)--1940-1950; |
Coverage | United States--Washington--Stevens County--Long Lake Long Lake |
Source | PG 94, Box 1, Folder Construction Methods and Long Lake Dam, 4 3200 |
Publisher | University of Idaho Library Digital Initiatives, http://www.lib.uidaho.edu/digital/ University of Idaho Library Special Collections and Archives |
Relation | Columbia River Basin Project Collection http://www.lib.uidaho.edu/digital/crbp/ |
Language | eng |
Type | Image;StillImage |
Format | image/jpg |
Rights | Material produced by the United States Army Corp of Engineers. In Public Domain. For more information, please contact University of Idaho Library Special Collections and Archives Department at libspec@uidaho.edu. https://creativecommons.org/publicdomain/mark/1.0/ |
Identifier | http://digital.lib.uidaho.edu/cdm/ref/collection/crbproj/id/931 |