An aerial view of the feeder canal looking west. The surface runoff chutes on the right slope of the canal in the foreground area are at stations 45+05 and 48+60, respectively. The slide cracks are visible at the left center. A good view of the...
1947-10-21
|
Columbia Basin Project, Irrigation Division, 2nd Section East Low Canal, Specs. 2603. Steel Construction Co. of Oregon, sub-contractor for J.A. Terteling and Sons. Blending machine operations. H.E. Foss, photographer.
1950-09-14
|
Columbia Basin Project, Irrigation Division, Specifications No. 2844. Third Section, West Canal, Schedule No. 1 and 2--Contractor: Marshall, Haas, and Royce, Haas and Rothschild--View showing outlet or downstream end of drainage culvert at Station...
1950-07-11
|
Columbia Basin Project, Irrigation Division, 2nd Section East Low Canal, Specifications No. 2603. Job fabricated wood burning hot water heating plant set up at jobsite in preparation for cold weather control of concrete temperatures. Water is...
1950-10-02
|
Columbia Basin Project, Irrigation Division, Soap Lake Siphon, Specifications No. 2411, Winston Brothers and Utah Construction Co., Contractors. This photograph is of the same area as photo No. 3220-04 but looking downstream. The men in the right...
1949-10-06
|
Timber plug between block 40, and steel cells in cofferdam section "G"; Preparing bedrock for block 39 in foreground - conveyor bridge in upper left.
1936-04-30
2024-11-06 |
Columbia Basin Project, Irrigation Division, Specifications No. 2324, Schedule 1, Long Lake Headworks and Concrete Canal Lining and Structures, Station 745+80 to Station 1101+29.0--Main Canal. Contractor: George B. Henly Construction Co., Inc....
1949-11-28
|
Columbia Basin Project, Irrigation Division, Specifications No. 2324, Schedule I, Long Lake Headworks and Concrete Canal Lining and Structures, Station 745+80 to Station 1101+29.0. Contractor: George B. Henly Construction Co., Inc. View of Long...
1949-09-28
|
Columbia Basin Project, Irrigation Division, West Canal. Spec. #1286--Utah Construction Co. and Winston Bros. Co. contractor. Bending reinforcing bars for Dry Coulee
1947-05-26
|
Columbia Basin Project, Irrigation Division, Specifications No. 1401, Long Lake Dam, Contractor: J.A. Terteling and Sons, Inc. A view of the completed dam from the east abutment. Long Lake Dam is 2 miles northeast of Stratford, Wa. Harold Foss,...
1949-10-11
|
Government camp looking west to Fiddle Creek Canyon.
1935-01-30
2024-11-06 |
Excavation on the west side. Trestle and catwalk in the distance.
1935-01-30
2024-11-06 |
Map Symbol A6
Map Symbol A7
Washington Natural Heritage Program and various botanical organizations. The total estimated cost of development is $140,000.
Horsetail Wetlands
SITE DESCRIPTION: The wetland north of Oneonta Gorge...
|
Diamond core drilling rigs set at the Grand Coulee Dam site.
1934-03-02
2024-11-06 |
2024-11-06
2024-11-06 |
approximately 421 kilowatt-hours per capita. Requirements can be expected to grow in relationship to population, and a large per capita increase in power used for these purposes seems in prospect. At the estimated rate of population growth, with...
|
Oroville
KEY MAP
Tonasket
Winthrop
TwispRiverside
Omak
Okanogan
Bridgeport
Chelan
Little Falls
SNOQUALMIE PASS
Leavenworth
Wenatchee
Douglas
Ephrata
LINCOLN
SPOKANE
KITITAS
ADAMS
LATAH
Colfax
GINKGO...
|
IRRIGATED LAND
POTENTIAL IRRIGATION PROJECT
EXISTING RESERVOIR RESERVOIR SITE
SUBDIVISION BOUNDARY
WATER POWER PLANT(I,000 H.P CAP., OR MORE)
POTENTIAL POWER PLANT
WATER RESOURCES DEVELOPMENT
LOWER COLUMBIA SUBDIVISION
|
IRRIGATED AREAS NON-IRRIGATED AREAS
ADAPTED FROM MAPS BY BUREAU OF AGRICULTURAL ECONOMICS, U.S. DEPARTMENT OF AGRICULTURE
LOWER COLUMBIA
CROP LAND
|
Six Tertiary rock units are exposed in the Buster Creek-Nehalem Valley area. They are, from oldest to youngest: upper Eocene
Tillamook Volcanics; upper Eocene Cowlitz Formation; upper Eocene Keasey Formation; upper Eocene Vesper Church formation...
1983-04-22 (iso8601)
|