Problem or Area of Concern
6.(Cont) COMMENT: Several items have been suggested to be considered in establishing future operating criteria for Dworshak Dam. For example, it is possible a larger minimum flow is needed for fish; allowable...
|
Falls on Niggerhead Creek 4 miles above road
The falls are 25 feet high
1936-10-23
|
WHAT THE EXPERTS HAVE TO SAY ABOUT GLEN CANYON DAM AND RESERVOIR SITE "Our carefully considered conclusion is that the dam site is entirely adequate for the dam now proposed, and that the presence of the Chinle shales in the reservoir basin...
2008-12-01
|
1957 CONGRESSIONAL RECORD — Sf NATE 5343
under an appointment which expires
May 2 1 , 1 9 5 7 .
Roy L. Stephenson, of Iowa, to be
United States attorney for the southern
district of Iowa for a t e rm of 4 years. He
is now serving in this office...
2008-11-01
|
Diversion dam on the Crooked River approximately 33 miles above the mouth
The dam is 13 miles above Dry Creek.
1942-06-25
2003-01-01 |
The pentacyclic tritcrpene
17β(H), 21β(H)-hop-22(29)-ene (diploptence) occurs
in sediments throughout the Columbia River
drainage basin and off the southern coast of
Washington state in concentrations comparable
to long-chain plantwax n-alkanes....
1992 (iso8601)
|
Barges of various sizes and purposes have had an important part in the construction of Grand Coulee Dam. The contractors built most of theirs of wood, and used them chiefly as platforms for derricks and cranes. Later, the Bureau constructed...
2024-11-05
|
the river basins' water quality, pollution control and abatement are subordinate to some other central purpose. The following analysis focuses on the single purpose water pollution control compacts addressing only the major differences between...
|
Here is shown the removal of the downstream section of the west cofferdam below the now-completed block 40. This will permit the river to flow thru the completed section of the dam off to the right, and enter its old channel to the left. The...
2024-11-05
|
The hydrogeologic setting was described and preliminary estimates of hydrologic components prepared for the Bull Run Lake and for the Bull Run Lake drainage basin, in the Cascade Range of northwestern Oregon. The 0.73-square-mile lake and the...
1996-11-05
|
Document: Memorandum for the President, Central Arizona Project, Draft, April 1965 (photocopy), page 6
1965-04-01
|
Document: United States Department of the Interior, Bureau of Reclamation, Memorandum Report, Lower Colorado River Perfection, Region 3, A.B. West, Regional Director, Boulder City, Nevada, March 1963, page 19
1963-03-01
|
Document: 87th Congress, 1st Session, House of Representatives, Public Works Appropriation Bill, 1962, September 6, 1961, page 27
1961-09-06
2006-09-19 |
central basin are as follows : Retail trade, 26 ; wholesale trade, 6.5; transportation, 8 ; construction, 10: professional and related services, 13; communications and utilities, 4; Government, 8; and all other, about 25.
Business opportunities...
|
CONFIDENTIAL
3
between France and Spain over the use of the waters of Lake Lanoux, the Arbitral Tribunal commenting on questions of customery law as distinguished from the Treaty, concluded that:
" . . . the upstream State has, recording to...
|
Dec. 16? [1963]
meeting in Secretary's office the week before Christmas...SLU, Carr, Dominy, Holum McCarthy...
PACIFIC WATER PLAN NOTES....
The Upper Basin, regardless of annual stream flow, is required by the Colorado River (Santa Fe) Compact...
|
TEMP. PRECIP
CENTRAL SNAKE PRECIPITATION AND TEMPERATURE DATA
SELECTED STATIONS
DATA FROM: WEATHER BUREAU U.S. DEPARTMENT OF COMMERCE
ous tributaries here emptying into it, and by rather broad, flat-floored valleys of the tributaries. At...
|
SNAKE - COLORADO PROJECT
A Plan to Transport Surplus Columbia River Basin Water to the Arid Pacific Southwest
I. THE PACIFIC SOUTHWEST WATER PLAN
In August, 1963, the U. S. Department of the Interior published a report entitled, "Pacific...
|
22
PUBLIC WORKS APPROPRIATIONS, 1962
State and project Revised budget estimate for fiscal year 1962 Allocation
Construction Planning Construction Planning
Oklahoma:
Arkansas River and tributaries, bank stabilization and channel rectification...
|
The early to middle Eocene submarine basalts of the Crescent Formation form the
core and basement of the structurally uplifted Willapa Hills region of southwest
Washington. The formation consists of a thick sequence of predominantly subalkaline,...
1992-12-07 (iso8601)
|
Six Tertiary units are exposed in the Onion Peak area near the town of Cannon Beach., Oregon. The units consist of: late Eocene to
early Miocene Oswald West mudstones (informal), middle Miocene Astoria Formation (Angora Peak sandstone and Silver...
1974-10-9 (iso8601)
|
biological systems," and propose an allocation of costs among communities and industries.79 The plan would be implemented with hydropower revenues and financial contributions from state and federal agencies.
The differences between the...
|
View of the Napoleon Bridge, taken from the left bank of the Kettle River, 300' upstream from the bridge site. The bridge spans were shifted from the old piers to higher concrete piers.
1942-04-23
2024-11-05 |
VV-91 CLEARWATER RIVER, IDAHO.
APPROPRIATIONS.
1879, $5,000, 79, 183.
1880, 5,000, 80, 2330.
1882, 5,000, 82, 2678.
1896 25,000, 96, 3384.
1899, 10,000, 99, 3232.
Total, 1 50,000 (deduct $12,294.41, unexpended balance, trans....
|