Columbia Basin Project, Irrigation Division, East Low Canal, Specifications No. 1422--Utah Construction Co. and Winston Bros. Co., Contractor. Looking northeasterly over Crab Creek Siphon No. 1. Bifurcation works junction of Main, West, and East...
1943-08-30
|
Columbia Basin Project, Irrigation Division, West Canal, Specifications No. 1286--Utah Construction Co. and Winston Bros. Co., contractor. Open outlet transition of Dry Coulee Siphon No. 2 showing back forms. Transition warps from vertical with a...
1948-09-24
|
Columbia Basin Project, Irrigation Division, Long Lake Dam. Assistant Resident Engineer, Donald B. McLaren checking fill moisture by the use of a proctor plasticity penetrometer. Representative material from the spread and processed lift is...
1948-05-24
|
Columbia Basin Project, Irrigation Division, West Canal. Spec. #1286--Utah Construction Co. and Winston Bros. Co. contractor. View of flash-pressure welding machine in operation, welding 1-3/4"" square reinforcing hoop. A.W. Bauman, photographer.
1947-05-22
|
Columbia Basin Project, Irrigation Division, Long Lake Dam, Spec. #1401, J.A. Terteling and Sons, contractor. Long Lake Dam 169 days after start of construction. Long Lake Dam is two miles northeast of Stratford, Washington. A.W. Bauman,...
1947-05-14
|
James Bunker, Manager
Vale and Warmsprings Irrigation Districts, and President, Oregon Water Congress
Vale, Oregon
Kessler Cannon, Director
Department of Environmental Quality Portland, Oregon
Emery Castle, Dean Graduate School...
|
This document describes the climate, vegetation, topography and drainage, geological formations (metamorphic rocks, Kittitas system, Columbia lava, clay and gravel interstratified with the Columbia lava, John Day system, river terraces, and...
1897-11-21
|
Columbia Basin Project, Irrigation Division, Pasco Settlers. Plowing scene on Unit 47, with an excellent stand of alfalfa in the background. Ken Marvin is doing the plowing, rents the farm from owner. H. Foss, photographer
1950-04-28
|
Columbia Basin Project, Irrigation Division, W-3 Laterals, Specs. 2880. W-25 Lateral Station 11+84.50 State Highway #7 crossing. Workman installing 43"" Class ""D"" pipe. Work is being performed by J.A. Terteling and Sons, Inc. under Schedule 1 of...
1950-11-08
|
Columbia Basin Project, Irrigation Division, Potholes East Canal. View showing stratification and fracturing in material in test pit at Sta. 499+00 at elevation 1028. View looks horizontally at corner behind miner in photo 2059-4 from same...
1948-09-02
|
Columbia Basin Project, Irrigation Division, West Canal, Specifications No. 1286--Utah Construction Co. and Winston Bros. Co., Contractor. Looking easterly over completed portion of Dry Coulee Siphon No. 1 from Section 172. Steel yard, where...
1948-09-15
|
Columbia Basin Project, Irrigation Division, Soap Lake Siphon, Specifications No. 2411--Utah Construction Co. and Winston Bros., Contractor. This photograph shows a "liner plate" about three quarters rolled. H.E. Foss, photographer
1949-06-27
|
Columbia Basin Project, Irrigation Division, Soap Lake Siphon, Specs. 2411. This photograph shows the left berm of the open outlet transition being excavated to original ground, preparatory to the placing of compacted backfill against the sides of...
1950-03-31
|
Columbia Basin Project, Irrigation Division, Third Section, West Canal, Specification 2844, Schedule 3. View looking upstream from invert of stilling pool at Station 2044+50 West Canal approximately, showing end of concrete chute at Station...
1950-11-09
|
Columbia Basin Project, Irrigation Division. Picture of diseased potato plant in potato field on Moses Lake Development Farm 2 miles east of Moses Lake. The disease is commonly referred to as Leaf Roll. The rolling of the leaves is often...
1947-09-17
|
Columbia Basin Project, Irrigation Division, Specifications 2844. View of eleven Kit trailers 33'-0 and one old house trailer located at the government housing area awaiting setting up in locations for the temporary housing of government employees.
1950-04-19
|
Advancing end of 21 inch reinforced (Class A-50' head) concrete pipe on the Burbank Pump Laterals HP 1.1 Station 50+25. Note groove of pipe filled with mortar. This feature under construction by Mathews Brothers about 7 miles east of Pasco,...
1949-06-27
|
Columbia Basin Project, Irrigation Division, Specifications No. 2324, Schedule 1, Long Lake Headworks and concrete Canal Lining and Structures, Station 745+80 to Station 1101+29.0--Main Canal. Contractor: George B. Henly Construction Co., Inc....
1949-12-14
|
Columbia Basin Project, Irrigation Division, Soap Lake Siphon, Specs. 2411. This photograph from Station 382+, looking downstream, shows the completed gravel trap and open inlet transition. The gravel trap baffles and their drains are clearly...
1950-06-21
|
Columbia Basin Project, Irrigation Division, Soap Lake Siphon, Specs. 2411. This photograph taken from concrete section 84A, looking upstream, shows a man on section 82A. Infra-red was used to accentuate the cloud effect. Work is being performed...
1950-06-09
|
Columbia Basin Project, Irrigation Division, 2nd Section West Canal, Specs. 2541. Backfilling around the Winchester Wasteway turnout. Allis Chalmers HD-5 tractor with Tracto-Loader is used to place material and to pull small roller used in areas...
1950-03-24
|
Columbia Basin Project, Irrigation Division, West Canal, Specifications No. 1286--Utah Construction Co. and Winston Bros. Co., Contractor. Looking west into open outlet transition of Dry Coulee Siphon No. 2. The forms are warped from vertical to...
1948-09-28
|