View of tunnels in the bank
1939-09-02
|
Columbia Basin Project, Irrigation Division, Specifications No. 2324, Schedule 1, Long Lake Headworks and concrete Canal Lining and Structures, Station 745+80 to Station 1101+29.0--Main Canal. Contractor: George B. Henly Construction Co., Inc....
1949-12-14
|
Columbia Basin Project, Irrigation Division, Soap Lake Siphon, Specs. 2411. This photograph from Station 382+, looking downstream, shows the completed gravel trap and open inlet transition. The gravel trap baffles and their drains are clearly...
1950-06-21
|
Columbia Basin Project, Irrigation Division, Soap Lake Siphon, Specs. 2411. This photograph taken from concrete section 84A, looking upstream, shows a man on section 82A. Infra-red was used to accentuate the cloud effect. Work is being performed...
1950-06-09
|
Master scanned with Epson 1640XL at 800 dpi. Image manipulated with Adobe Photoshop 7.0.
1937-08-17
|
Master scanned with Epson 1640XL at 800 dpi. Image manipulated with Adobe Photoshop 7.0.
1938-11-30
|
Columbia Basin Project, Irrigation Division, 2nd Section West Canal, Specs. 2541. Backfilling around the Winchester Wasteway turnout. Allis Chalmers HD-5 tractor with Tracto-Loader is used to place material and to pull small roller used in areas...
1950-03-24
|
Columbia Basin Project--Irrigation Division, Adrian Gravel Plant--Specifications #1475. Cedar Rapids 20"" x 36"" primary crusher with jaws set at 3 inches, located at Adrian Gravel Plant. Feed hopper is shown at left and blending sand conveyor...
1948-06-02
|
Columbia Basin Project, Irrigation Division, West Canal, Specifications No. 1286--Utah Construction Co. and Winston Bros. Co., Contractor. Looking west into open outlet transition of Dry Coulee Siphon No. 2. The forms are warped from vertical to...
1948-09-28
|
Columbia Basin Project--Irrigation Division. East Low Canal--Specifications No. 1422. View of mobile laboratory used to make test cylinders and air entrainment tests of canal lining concrete. Equipment shown includes half-cubic foot unit weight...
1948-09-08
|
Columbia Basin Project, Irrigation Division. Moses Lake Development Farm 2 miles east of Moses Lake. Twelve hours after a 3/4 inch rain which fell between 5pm to 10pm September 16th, water was standing in alternate furrows in the low flat areas of...
1947-09-17
|
1 map: color, 35 x 92 cm.
Soundings are in feet and show the depth at Mean Lower Low Water. Various types of hachures show various depth contours: thirty foot, twenty-four foot, eighteen foot, twelve foot, and low water lines. Scale:...
2024-11-22
|
Master scanned with Epson 1640XL at 800 dpi. Image manipulated with Adobe Photoshop 7.0.
1937-06-30
2003-01-01 |
Master scanned with Epson 1640XL at 800 dpi. Image manipulated with Adobe Photoshop 7.0.
1937-07-31
2003-01-01 |
1 map : col. ; 29 x 36 cm., on sheet 37 x 44 cm. Relief shown by hachures and spot heights. Entered according to Act of Congress in the Year 1853 by J.H. Colton & Co. in the Clerk's Office of the District Court of the United States for the...
2024-11-22
|
Document: Appendices to Pacific Southwest Water Plan Review Draft "Bonneville Power Administration Appendix", August 1963, pagination added, page 2
1963-08-01
|
Document: "Snake-Colorado Project, A Plan to Transport Surplus Columbia River Basin Water to the Arid Southwest", October, 1963, table 4
1963-10-01
|
Document: "Snake-Colorado Project, A Plan to Transport Surplus Columbia River Basin Water to the Arid Southwest", October, 1963, page 18
1963-10-01
|
Document: "Snake-Colorado Project, A Plan to Transport Surplus Columbia River Basin Water to the Arid Southwest", October, 1963, page 10
1963-10-01
|
Letter: FromLawrence Mehren, Chairman, Central Arizona Project Association, to Stewart Udall, January 5, 1965 (thermofax), page 1
1965-01-05
|
View of concrete specimens being tested for resistance to sulfate waters in ponds at elevation 1930 southwest of the 230-Kv switchyard at Coulee Dam. View shows cylinders, bars, and posts from test batches 48-72 setting in original alkali pond...
1949-11-18
|
PP-8.0 relift pump of 3H.P. used to deliver 3 cu. Ft./sec. to two farm units. Temporary electrical equipment installed on pole structure for 1948 irrigation season. Portable sheet metal house behind house will be set over installation for...
1949-01-05
|
Columbia Basin Project--Irrigation Division. West and East Low Canals--Specifications 1286 and 1422. Winston Bros. Co. and Utah Construction Company, Contractors. View shows entire group of cores removed to date from 4 1/2-inch canal lining....
1948-10-28
|