Record Details
Field | Value |
---|---|
Title | A Plan to Transport Surplus Columbia River Basin Water to the Arid Pacific Northwest |
Description | Document: "Snake-Colorado Project, A Plan to Transport Surplus Columbia River Basin Water to the Arid Southwest", October, 1963, page 18 D. Project Costs As shown on the attached Table 4, the cost of initial construction for the Snake-Colorado Project would be $945.7 million and the cost of the deferred expansion program $346.8 million, for a total construction cost of $1.293 billion. The overal cost, including $104.9 million for interest during construction, would be $1.397 billion. A summary of all annual costs for the Snake-Colorado Project is shown on the attached Table 5. The annual capital cost of $44.2 million... Epson Perfection 4870 Photo, 400 dpi, 8 bit, 1,442,949 bytes |
Creator | Department of Water and Power City of Los Angeles |
Date | 1963-10 2006-9-26; 2006-09-26 |
Type | text |
Format | image/jpeg |
Identifier | su08149.jpg http://server16127.contentdm.oclc.org/u?/udallcoloradoAZU,11046 |
Source | Az 372 Box 174, Folder 9 |
Language | eng |