Concrete block on east abutment, showing grouting and drainage tunnel and upstream fillet.
1937-04-23
2024-11-24
East abutment, July 1937, showing low and high trestles, 24-ft. diameter penstock blackouts below elevation 1024 trestle.
2024-11-24
2024-11-24
Blocks in east abutment between high and low trestles. Reinforcing is around penstock blackouts.
1937-04-23
2024-11-24
Placing concrete under elevation 1024 trestle inside supporting tower.
2024-11-24
2024-11-24
Filling diversion block 32, looking downstream, December 23, 1937.
1937-12-23
2024-11-24
Cooling water supply pipe, upstream, near east abutment.
1937-11-30
2024-11-24
Blocks between high and low trestles, looking west. Cooling pipes on floor of blocks.
1937-04-23
2024-11-24
Grout agitator in grout plant.
2024-11-24
2024-11-24
Two duplex-injection pumps.
2024-11-24
2024-11-24
A grout-injection pump, cement mixer and grout agitator.
2024-11-24
2024-11-24
East end of dam, and high and low trestles. Reinforcing for penstock blackouts. East power house substructure in foreground.
1937-07-09
2024-11-24
Reinforcing around 24-ft. diameter octagonal penstock blockouts, units E1 and E2. Elevation 1024 trestle in upper in upper part.
1937-04-23
2024-11-24
Substructure for east power house. Eastmix above.
1937-08-25
2024-11-24
Turbine pits in east power house low trestle above. High trestle at extreme top.
1937-10-29
2024-11-24
Downstream clean-up prior to flooding. East power house on left; spillway with spillway bucket between the two training walls. High trestle in upper left. Pipe in foreground is for cement transportation from silos on west side.
1937-11-15
2024-11-24
Spillway bucket. Elevation of lip, 900; bottom of invert, 870. Radius 50 feet. East training wall in the distance.
1937-10-29
2024-11-24
Forms around east training wall.
1937-09-02
2024-11-24
Serids in invert of spillway bucket.
1937-09-21
2024-11-24
Turbine pits in west power house substructure. Elevation of 950 diversion blocks. 24-ft.-diameter main-unit penstock blackouts; and 12-ft.-diameter station-service unit blockouts in lower right corner.
1937-04-29
2024-11-24
West end of dam, January 5, 1937, with low and high trestles and low diversion blocks.
2024-11-24
2024-11-24
Winter scene. Blocks at west end of dam covered with snow and ice.
1937-01-28
2024-11-24
Turbine pits in west power house.
1937-05-01
2024-11-24
Elevation 950 diversion slot in block 13. Octagonal 12-ft. diameter blockouts are for 6-ft. diameter station-service unit penstocks.
1937-05-01
2024-11-24
A 50-ft. wide diversion slot between high blocks in west power house area.
1937-05-01
2024-11-24
24-ft. diameter octagonal penstock blockout in west power house. Low blocks are for river diversion.
1937-05-01
2024-11-24
1751 - 1775 of 2531 Items    << < 66 67 68 69 70 71 72 73 74 75 > >> 