Results

276 - 300 of 2233 Items    << < 7 8 9 10 11 12 13 14 15 16 > >> 
Thumbnail
Title
Description
Dates
A black and white image showing construction of the Interstate Bridge across the Columbia in Portland. Men and construction equipment are visible in the image. Wooden scaffolding and utility poles are also visible. This is Vancouver - Portland...
2004-03-24
The Oregon Plan for Salmon and Watersheds Biennial Report 2005-2007. This is the sixth report on the Oregon Plan for Salmon and Watersheds. The report provides an update on the accomplishments and continuing efforts of people throughout Oregon to...
2024-05-18
2007-06-22
2007-03-02
Papers relating to Raymond and Reatha Wilson and their work at the Kaiser shipyards in Portland, Oregon, including photographs, printed matter, and ephemera.; Papers relating to Raymond and Reatha Wilson and their work at the Kaiser...

The William L. Finley Papers document the wildlife conservation work of Finley and his wife Irene, and the photography work of Herman T. Bohlman, who worked with Finley in the first decade of the 20th century. Finley was a...

APPENDIX UU----REPORT OF MAJOR HANDBURY. 2829 A summary of the weather and -water-gauge records is transmitted herewith. Hie following drawings relating to the work.are also transmitted; Sheet 1, showing the work finished...
2006-06-16
[unrelated material omitted] IMPROVEMENT OP THE WILLAMETTE RIVER ABOVE PORTLAND, OREGON—CONSTRUCTION OF CASCADES CANAL, COLUMBIA RIVER—IMPROVEMENT OF UPPER COLUMBIA, SNAKE, AND COWLITZ RIVERS, OREGON OR WASHINGTON TERRITORY, AND OF LOWER...
2006-02-28
stern-wheelers except the Idaho, a small old side-wheeler, which has of late years been run on the Middle Columbia as a winter boat. Barges as well as steamers take their loads on deck entirely. The freight is laid in packages and is moved by...

002. IMPROVEMENT OF UPPER WILLAMETTE AND YAMHILL RIVERS, OREGON. The amount available. for the continuance of this improvement at the opening of the fiscal year was $18,373.16, a part of which was under contract for rock removal at Rock...

POINT ADAMS AND CLATSOP SPIT, AND SAND ISLAND. The annual survey of the shore line at these points was made by direction of the department from the appropriation for' improving the mouth of the Columbia River," and the details will be found in...

river at Portland being 19 feet above low-water on March 16. This freshet rapidly subsided, and on May 5 reached a level of 5 feet above low-Water. The Columbia again commenced rising, the Willamette above the falls still falling, while below the...

ance of fine weather, necessary for this kind of work, decided me to adopt this plan instead of waiting for more favorable tides. The season was far advanced, and the winter rains liable to commence at any time, raising the water and bringing down...

The following is a statement of the moneys expended and available for this improvement during the fiscal year : Available July 1, 1872 $50, 000 00 Expended : Removal of rocks $19, 296 69 Superintendence, office expenses, &c 2, 488 98...

the west side of the Cascades, under the summit of which the line passes in a tunnel nearly 8 miles long, to the Columbia River near the city of Wenatchee. Almost all of the railroad mileage in the basin is single-track line. Highways The...

WW-2 COLUMBIA RIVER, OREG., WASH., AND IDAHO. Part. Title. Period. a Plan of presenting data b Index to point named in following abstracts c List of notable points, mouth to headwaters d Appropriations 1S66-1912 o Gauging...

W I. IMPROVEMENT OF THE 'WILLAMETTE RIVER AT PORTLAND, OREGON, AND TO MOUTH. Swan Island, Bar.—Work has been carried on at this bar for five years past, the object for the last three years being to cut a channel 100 feet wide and 17 feet...
2004-08-25
COLUMBIA RIVER HIGHWAY SERVICE STATION Repairing Supplies Accessories Ford Parts United States Tires Oils Batteries Gasoline Presto Service TOURING AND SERVICE CAR Always on the Job FRED SALZMAN, Prop. 19 Miles East of Portland, on the Highway...

"July 1999."
1999-05-18
2005-02-25
2004-12-22
Materials relating to the Kaiser shipyard in Portland, Oregon, and to the construction of the Grand Coulee Dam.; Materials relating to the Kaiser shipyard in Portland, Oregon, and to the construction of the Grand Coulee Dam. Includes:...

The lower Columbia River Basin includes the river basins draining into the Columbia River below Bonneville Dam—the largest of which is the Willamette River. This report presents the results of a study by the U.S. Geological Survey, done in...
1996-05-18
The Maps of Washington (State) and the Pacific Northwest consist of historic and superseded maps depicting forest resources, geology, public lands and land use, hydroelectric projects, highways, and railroads in Washington and the Pacific...

The purpose of this study was to answer three questions in terms of learning methodology: (1) Is the inductive or deductive approach more effective in teaching phonic generalizations to second grade children? (2) Is the inductive or deductive...
1968-05-31 (iso8601)
pipe, 1,918 feet long, running along the entire length of the ground occupied by the buildings and workshops, Twelve 2-inch fire-plugs are attached to this pipe in such positions that two streams can be brought to bear on any building with the use...

[unrelated material omitted] APPENDIX OO. IMPROVEMENT OF RIVERS AND HARBORS IN OREGON AND IN WASHINGTON TERRITORY—IMPROVEMENT OF LOWER CLEARWATER RIVER, IDAHO—CONSTRUCTION OF CASCADE CANAL, COLUMBIA RIVER. REPORT OF CAPTAIN CHARLES F....

winter. The total amount of material removed during the season was 20,795 cubic yards in 41 working days. As the river is narrow and the channel-way quite restricted for deep-draught vessels, a, great deal of time was lost by the dredger in...

276 - 300 of 2233 Items    << < 7 8 9 10 11 12 13 14 15 16 > >> 

© Western Waters Digital Library - GWLA member projects - Designed by the J. Willard Marriott Library - Hosted by Oregon State University Libraries and Press