Cost To Date
Construction work in progress $278,240,521
Completed plant in service 7,423,214
Service facilities 14,776,879
Total $300,440,614
The three other Bureau of Reclamation projects, whose total investment has topped $300 million, and...
|
-2-
For Hualapai Tribe of the Hualapai Reservation, Arizona
Royal D. Marks, Phoenix, Arizona
Arthur Lazarus, Jr., Washington, D. C.
For Upper Colorado River Commission
E. R. Callister, Salt Lake City, Utah
For The Navajo Tribe
Norman M....
|
IRRIGATION AND THE ? CENTRAL VALLEY ; PROJECT 17
erty in the' Central Valley area reached the enormous total of over $.3 billion in 1953. Indicative of the essentially rural character of the economy is the fact that about $2,212 million, or 71...
2009-04-01
|
California State Chamber of Commerce
AGRICULTURE AND INDUSTRY
San Francisco
office of the general manager
June U, 1956
Honorable Arthur V, Watkins United States Senate
Committee on Interior and Insular Affairs Washington, D. C.
Dear Senator...
2009-04-01
|
11
Southern part. Water supply paper no0 146. Proceedings of second conference of engineers of the Reclamation Service, with accompanying papers, compiled by F. H, Newell, 1905• 267 p.
Seei Pumping underground water in southern California,...
2009-04-01
|
Irrigation canal in grass at right. Note on envelope reads, "Grand Junction Indian School Drainage Project, Nov 1916." The Grand Junction Indian School was also known as the Teller Institute.
1916-11-01
2016-12-05 2016-12-05 |
1963
CONGRESSIONAL RECORD ~r SENATE
1631
American pro consuls all over the globe, and if some of them have swashbuckled, as pro consuls often do, on the whole they have played their part well and generously. However superior the administration may...
2008-09-01
|
Document: United States Department of the Interior news release, "Colorado River Storage Project Becomes Fourth Bureau of Reclamation Project to Exceed Total Investment of $300 Million," January 4, 1963, page 2
1963-01-04
|
CONTENTS (Continued)
Part VII. Anticipated Effects of Additional Developments (Contd.)
A, Description of projects (Contd.}
Navajo Unit ................
Cure c an ti Unit ..............
Seedskadee Project ............
Lyman Project ........
2008-10-01
|
DECISIONS PERTINENT TO' PROPOSED WATER RIGHTS ACT 11 The Court determined that the detailed provisions of the Federal Power Act, providing for the Federal plan of regulation, leave no room or need for conflicting State controls. It is the Federal...
2009-04-01
|
The Small Manuscripts and Subject Files contains primarily single-item or subject-created collections.; The Small Manuscripts and Subject Files contains primarily single-item or subject-created collections.; Folders are arranged alphabetically.;...
|
Columbia Basin Project, Irrigation Division, Soap Lake Siphon, Specifications 2411, Utah Construction Company and Winston Bros. Co., Contractor. This photograph of two 2-inch I.R. insert bits. The one on the left is new. The one on the right has...
1949-05-10
|
acre-feet for the Pacific Southwest area from surplus water supplies on the Lower Eel River in the North Coastal Section of California. This additional aqueduct enlargement needs to be included initially to permit its construction as an...
|
Report:United States Department of Interior, Stewart L. Udall, Secretary, Bureau of Reclamation, Floyd E. Dominy, "Pacific Southwest Water Plan", Report of August 1963 as modified January 1964, Chapter II, page 13
1964-01-01
|
36
IRRIGATION AND THE CENTRAL VALLEY PROJECT
distances to hunt, involving- expenditures for travel, lodging, meals, gasoline, tires, and other expenses. These expenditures create 'a sustained market in the valley and in areas like San Francisco...
2009-04-01
|
Caption further reads, "Max pressure 600#/sq. in. Jetting a 3/8" piez. pipe to 25'. Took about 2 min." Caption on second print reads, "Getting down piezometer pipes (3/8") with converted Bean sprayer outfit. Using about 200 psi. Appleton drainage...
1951-10-01
2016-12-05 2016-12-05 |