Results

4776 - 4800 of 4837 Items    << < 187 188 189 190 191 192 193 194 > >> 
Thumbnail
Title
Description
Dates
P12-200-2646-Klamath Project, California - TULE LAKE SUMP 3 - N-12-c Lateral, Specifications DC-5621. View looking north to failure in berm between lateral and drain on right; April 9, 1962; Photo by K.J. Greene
1962-04-09
2008-08-07
2006-04-06
KP-2623-R2-Klamath Project -- TULE LAKE SUMP 2, Specifications No. DC-5483, 102-H Drain. Model 90 Link Belt speeder dragline with 1 1/2 cubic-yard bucket excavating drain prism at Sta. 35+50; September 18, 1961; Photo by J.A. Renning
1961-09-18
2008-07-21
2006-04-06
DRAFT 1/12/65 - 4 - deliveries are low; with the understanding that during the period October 1 to February 10 the United States pump insofar as practicable from the more saline wells in the District, and also during other periods when the total...
KP-2556-R2-Klamath Project - TULE LAKE DIVISION - Sump 2, Specifications DC-5248, 102-E Drain. Model 80 Lorain Dragline with 2 cubic yard bucket excavating the 102-E Drain, Station 94+00; August 23, 1960; Photo by John A. Renning
1960-08-23
2008-05-29
2006-04-06
KP-2513-R2 -- Klamath Project -- SUMP 2 - TULE LAKE. Trench was excavated to hold muck; July 30, 1959; Photo by L. McAnulty
1959-07-30
2008-04-23
2006-04-04
P-12-200-2696 - Klamath Project, California - TULE LAKE SUMP 3 - 101-B-1 Drain, Station 110. View looking south showing bulged section of drain due to material piled on berm. Fish and Wildlife Service were constructing extension of N-12-e...
1962-08-06
2008-03-06
2006-04-18
Late 1964? Presidential Statement on Agreement With Mexico to Resolve Colorado River Salinity Problems The governments of the United States and Mexico have today approved an agreement reached between the Commissioners of the International...
KP-2388-R2 - Klamath Project--TULE LAKE DIVISION. Experimental drain about 300' south of pumping plant. Looking south to new bank subsidence in foreground and showing bank subsidence in backgroud which started 2 or 3 weeks before; May 14, 1957;...
1957-05-14
2007-12-27
2006-03-14
- 3 - 5. The United States should conclude arrangements which would permit discontinuance of discharges from the wasteways of the Yuma County Water Users' Association to the bed of the Colorado River below Morelos Dam, and if necessary for this...
"December 1993."; "NPS D-155."; Other agencies: Oregon Department of Fish and Wildlife; National Biological Survey, Cooperative Park Studies Unit, College of Forestry, Oregon State University; Includes bibliographical references (p. 44)
1993-05-12
2007-12-10
2005-08-08
-5- No implication of more water or quality commitment 3. Both the United States and Mexico recognize that this solution in no way implies that Mexico is entitled to more water than the quantities specified in the 1944 Treaty, or that the United...
KP-1238-R2 - Klamath District - Modoc Unit - Coppeck Bay Area. The core trench under the left bank is excavated large to furnish sufficient material for building of the right lateral bank after it has been partially built up with carryall taking...
1946-08-14
2006-06-30
2005-07-29
KP-1164-R2 Klamath Project - Railroad Siphon; General view of the railroad siphon of the Klamath Straits Drain just after the drain was filled with water; March 13, 1946; Photo by R. S. Hopkins
1946-03-13
2006-06-06
2005-07-20
There are many other details in connection with the bypass proposal that must be resolved and clarified before a final solution can be affected, including design and construction, operation plans, and fiscal matters. additionally, to carry out...
KP-1142 - Klamath Project; Skid dragline working in swampy ground preparing puddle trench and drain ditch for later operations of a larger machine; August 14, 1945; Photo by C. O. Wamstad
1945-08-14
2006-05-26
2005-07-20
4776 - 4800 of 4837 Items    << < 187 188 189 190 191 192 193 194 > >> 

© Western Waters Digital Library - GWLA member projects - Designed by the J. Willard Marriott Library - Hosted by Oregon State University Libraries and Press