Results

2101 - 2125 of 5942 Items    << < 80 81 82 83 84 85 86 87 88 89 > >> 
Thumbnail
Title
Description
Dates
Statement of imports to and exports from Snake River points, by steamboat, &c.—Cont'd. EXPORTS. Where from. Articles. Merchandise Lumber Flour and feed Household goods Cattle Hides Wool Wheat Flaxseed...

the language of the opinion rendered by Judge Deady, it is surprising that " any person should have the hardihood to undertake such an important enterprise without first obtaining the sanction of Congress." I respectfully invite attention to the...

The effectiveness of flow augmentation in aiding conservation and recovery of Snake River salmonid populations listed under the Endangered Species Act is questionable. The purpose of flow augmentation has been largely to increase the velocity...
2000-09-01
Black Falls near Polar Star Mine
The falls are about 60 feet high and are a barrier at all times.
1941-05-13
FEDERAL WATER RIGHTS LEGISLATION 19 tion that is to be protected, the proper distinction is in terms of the effect of any proposed diversion on navigation, not in terms of the place where the diversion is made. If, vice versa, diversions for...
2009-02-01
Falls down canyon wall on lower Grays River The falls are 150 feet high
Photo shows typically canyonous nature of stream banks
F Jobes is standing in lower center
1937-05-19
1. Slime interferes with commercial and sport fishing by fouling nets and gear. 2. The wastes from the pulp and paper industry are primarily responsible for this problem. The additional wastes resulting from increased production since 1959 have...

ambitious document, addressing not only the mitigation needs of salmon, but also proposing an institutional structure in which the Service would assume responsibility for coordinating a wide array of recovery actions.228 In substantive areas, the...

settlement pressure, other Nez Perce leaders executed amendatory documents in 1863, ceding the Wallowa lands. Tribal leaders challenged their validity and nearly succeeded when white settlers were ordered to leave the Valley. However, the order...

8 p. Selected pages of the Report of the Chief of Engineers, United States Army for 1882. Included are annual reports detailing improvements of rivers and harbors in Oregon and Washington territory.
1882-11-02
19 p. Selected pages of the Report of the Chief of Engineers for 1871. Also includes annual report on the works of river improvement in Oregon for the fiscal year.
1871-11-02
Concrete portion of the Wenatchee canal for supplying Wenatchee river water to the Leavenworth station.
1940-05-09
2024-11-02
A temporary restraining weir or rack across the Wenatchee River at the head of Tumwater Canyon. This rack prevents transplanted salmon from swimming downstream and returning to their old spawning grounds.
1939-07-26
2024-11-02
INDEX Maps Page Portland - Mist Falls 3 Mist Falls - Hood River 7 Hood River - The Dalles 9 Hood River - Mt. Hood Lodge 45 Road Log Portland - Hood River 5 Hood River - The Dalles 9 The Dalles - Celilo Falls 35 The Dalles - Gardner's Point 35...
2004-07-06
Source Tentative Disposition WI-70 F-16, 19 WI-69 Problem or Area of Concern 22.( Cont) COMMENT: Recreation use studies of the Hells Canyon reach have been conducted in the past particularly in conjunction with proposed water...

Master scanned with Epson 1640XL at 800 dpi. Image manipulated with Adobe Photoshop 7.0.
1936-05-31
1 map: hand col., 24 x 22 cm. Catholic missionary and northwest explorer, Fr. Pierre John DeSmet, established a mission with the Flathead Indians of the Bitterroot Valley near present day Missoula, Montana on September 24, 1841. Having gained the...


2 Bonneville and Grand Coulee. Keystone of Northwest Hydropower With the beginning of the Great Ice Age, about one million years ago, huge glaciers—massive sheets of moving ice—spread south out of Canada across much of central and...

Jan ? 1965 PROPOSED WHITE HOUSE PRESS STATEMENT The United States and Mexico have today approved an agreement reached between the Commissioners of the International Boundary and Water Commission, United States and Mexico, upon measures to be...
Cost To Date Construction work in progress $278,240,521 Completed plant in service 7,423,214 Service facilities 14,776,879 Total $300,440,614 The three other Bureau of Reclamation projects, whose total investment has topped $300 million, and...
EXECUTIVE SUMMARY This document describes the rationale for and implementation of an Integrated Land Management (ILM) Plan for the Tule Lake National Wildlife Refuge (NWR). The proposal is the recommendation of 5 representative stakeholders in the...
2024-11-02
2006-11-15
2005-06-02
2510 KEPORT OF THE CHIEF OF ENGINEERS, U. S. ARMY. Railway and Navigation Company, to whose skill and judgment the success of the operations were mainly due. RIVER WORK. Surveys.—Early in September the floating plant, which was in...
2006-06-16
The Engineering Experiment Station Records document engineering research conducted by faculty, staff, and students at Oregon State University. The bulk of the collection is comprised of the Papers of Samuel H. Graf. The Engineering Experiment...

also at shoal places below Saint Helen's, and in snagging operations. The original estimate of the cost of the permanent works is $298,974. The total appropriation since adoption of the present plan, in 1877, is $367,000 ; of this amount about...

The following statement shows the average number of men per day employed during each month of the sear: Month. Canal work. River work. Total. July 13. 9 1. 1 15.0 August 58. 8 4. 2 63.0 September 128. 4 18. 4 146.8 October 159. 3...

2101 - 2125 of 5942 Items    << < 80 81 82 83 84 85 86 87 88 89 > >> 

© Western Waters Digital Library - GWLA member projects - Designed by the J. Willard Marriott Library - Hosted by Oregon State University Libraries and Press