Results

5776 - 5800 of 5942 Items    << < 227 228 229 230 231 232 233 234 235 236 > >> 
Thumbnail
Title
Description
Dates
While the impacts of long-term climate change trends on glacier hydrology have received much attention, little has been done to quantify direct glacier runoff contributions to streamflow. This paper presents an approach for determining glacier...
2010 (iso8601)
daily/weekly periods of low power demand. As daily power demands increase, the flow can be reversed through the pump-turbines and power generated to meet peak demands. Two 50 mw units were placed in operation in 1974, and four more are planned....

As the cutting edge of the graving dock caisson came to rest on higher projecting points of bedrock smaller caissons, consisting of precast concrete rings, were sunk to bedrock around the inside edge of the large caisson. After these were filled...
2024-11-24
Image captions: Linemen hold a sock used to pull the conductor across the Columbia River (Vancouver-Eugene line). Gin pole in use on the Vancouver-Kelso line.

December 1973, an agreement on concepts was announced. From it evolved a general blueprint for projecting the program beyond 1981. The projection became known as Phase 2 of the Hydro-Thermal Power Program. The Phase 2 planning as of early 1975...

Album leaf 56

PH Coll 238.56
2024-11-24
This is a view inside the chamber beneath the drumgate structure. The hinge system shows along the front edge to the right. Controlled admittance of water into this chamber determines the relative position in which the sealed drumgate will...
2024-11-24
Satellite-derived data provide the temporal means and seasonal and nonseasonal variability of four physical and biological parameters off Oregon and Washington (41°–48.5°N). Eight years of data (1998–2005) are available for surface chlorophyll...
2008 (iso8601)
tricts in the respective states. By the winter of 1938, 25 Washington public utility districts, the Seattle and Tacoma municipal systems, and a number of smaller municipalities were eligible to receive Bonneville power under the...

Label on verso: US WPA 459; DATE: June 27, 1941, O.P. 65-2-93-146, Dist.1; PHOTO BY: Morgan Fitz, Camp Kettle; COUNTY: Stevens; Neg. No. 907; TITLE: Columbia River Reservoir Clearing Proj; CAPTION: CAMP KETTLE NIGHT SERVICE MEN SERVICING TRUCKS...
2024-11-24
plants were small and served a limited locality. (The tremendous hydro potential of the Columbia River was not tapped until 1932 when Puget Sound Power & Light Company completed its dam at Rock Island below Wenatchee, Washington, —although a...

Label on verso: WORKS PROGRESS ADMINISTRATION, M-9 STATE OF WASHINGTON; Date taken: May 17th, 1939; Zone; County; City; Title: COLUMBIA RIVER CLEARANCE PROJECT. Descriptive Caption: View of Ward in Infirmary at Camp Lincoln with patient...
2024-11-24
Caption included with image: "MARCUS MOVES" -- A common sight to the WPA Crews clearing the Columbia river reservoir area, is that of towns being moved. Now its Marcus' turn. This house, being hauled on multiple wheels along Main Street, is the...
2024-11-24
Here, we describe and demonstrate a geographic information systems-based lithic morphometric research (GLiMR) software approach. GLiMR accurately and rapidly handles a sequence of ArcGIS procedures to extract geometric morphometric data from 2D...
2015-04-03 (iso8601)
Caption on image: C-421

Caption on verso: WORKS PROGRESS ADMINISTRATION, M-9; STATE OF WASHINGTON; Date taken: 6/20/39; Zone: 1; County; City; Title: Columbia River Clearance Project;...
2024-11-24
Caption on image: Air photo of old and new Marcus, looking northward. At a point above the southern part of old Marcus, the evacuating town is seen below the bench on which new Marcus is developing. Long street in center is Main street. Low long...

Third, in February, 1974, public hearings were held in Walla Walla for managing the lower Snake River. Minimum flow projections brought severe criticism from Idaho and concern from federal power development agencies, thus underlining the need for...

Label on verso: WASHINGTON STATE...
2024-11-24
them to be a more positive force in river basin planning. The State of Washington has consolidated the several water planning functions into a new Department of Ecology. A Water Resources Board was established in Oregon and the state legislature...

Laying the rails of the construction railroad in the Grand Coulee just south of Eagle Rock. Upon completion of the railway in June of 1935, the contractor, David H. Ryan, received $269,533.97 for his work. On Oct. 01, 1934 the MWAK Co. let a...
2024-11-24
0RELEASE OF COLORADO RIVER WATER 23 Senator ANDERSON. But along may come the Army Corps of Engineers and say, "Dump all of this water. We do not like it there." Have you not some authority to resist? You did resist once. You refused to drink when...
the Northwest, including both large pumping installations and small individual farm pumping plants. 8. Analysis of prospective use of electrical farm production equipment of various types. 9. Estimate of probable future trends in street and...

5776 - 5800 of 5942 Items    << < 227 228 229 230 231 232 233 234 235 236 > >> 

© Western Waters Digital Library - GWLA member projects - Designed by the J. Willard Marriott Library - Hosted by Oregon State University Libraries and Press