Source
PI-50 WI-70
WI-73 F-16
Tentative 1/ Disposition
A A
WI-70 C F-9, 14
Problem or Area of Concern
A. System-Project Operational Effects
1. If shoreline becomes a mud bank at low pool, it detracts from reservoirs' public...
|
Source PI-21
PI-96 F-17
PI-18
SI-73 C F-17
PI-21 F-17
Tentative Disposition
C F
Problem or Area of Concern
9.( Cont)The introduction of new varities should be very carefully considered. Often the new varieties are more...
|
Stator and bracket assembly for main unit L-6, weighing 335 tons, being lifted into its permanent position in bay 6. Two travelling cranes, with a lifting capacity of 375 tons each, are shown carrying the unit from its temporary point of assembly,...
1943-05-22
|
Placing the last section of the scroll case for L-7 turbine.
1947-03-10
|
96 pound block of concrete found in unit L-4 turbine runner, 3-20-44. The 7/8"" diameter hole in the foreground appears to have been an anchor bolt hole. Rectangular dimensions are 17"" x 11"" while wedge side dimensions are 17"" x 10"" x3""
1944-03-20
|
Testing a concrete specimen--it appears to have failed
1940-10-07
|
close up view of the three dimensional model
1938-11-03
|
Transporting spider to the powerhouse--Grand Coulee in background.
1941-02-17
|
Problem or Area of Concern
Source
WI-9, 34, 60 SI-74
SI-76 PI-59 SI-76
Tentative Disposition
EE. Regulatory Alternatives
1. Users should pay for use of navigation facilities. (G.B. 27)
Navigation companies should share the...
|
Grand Coulee Dam Seismograph Station, showing seismograph equipment before installation, arranged only for photographic purposes. Dr. Dead S. Carder of the U.S. Coast and Geodetic Survey is simulating the adjustment of position of galvanometers on...
1942-09-16
|
close up view of three diamond core drill bits
1941-09-26
|
Problem or Area of Concern
Source
Tentative
Disposition
A
F-7 F-5
4.(Cont) COMMENT: Definite site planning for commercial thermal plants is not a direct responsibility of the CR&T study. The above potential development sites are known...
|
TABLE OF CONTENTS (Cont'd)
Part Page SECTION 6: RECREATION
A.. Possible Operational Improvement of Existing
Projects III-70
B. Recreation Demand Forecast III-73
C. Alternatives and Supplemental Development III-74
D. Management...
|
Photo of Long Lake Dam taken for display purposes
1949-04-06
|
Objective III:
Objective IV:
2. Develop a program for removal or replacement of signs which do not conform to the sign guidelines.
3. Minimize visibility of utility structures, including railroad equipment, using screening, natural...
|
Land Exchange
Hardship acquisitions are mandated in Section 9(c) of the Act. This section directs the Secretary to give prompt consideration to cases in which the landowner will suffer hardship if the government does not acquire the land...
|
Map Symbol S4
Map Symbol S5
Ortley Overlook
SITE DESCRIPTION: This site offers a superb view of Rowena
Plateau and of The Dalles. At 2000 feet elevation, there are off-site views of Mount Hood and Mount Adams. There is currently no road...
|
Excavation for block 40, cross-river conveyor trestle at right - crossing over cell cluster "D" of west cofferdam.
1935-09-26
2024-11-24 |
10206
CONGRESSIONAL RECORD — SENATE
July, 16
great populations are concentrated there is no way people can go underground and be safe from the effects of the hydrogen bomb. They have decided that the moving of the population probably will be...
2009-05-01
|
Compliance
with Section
106
Discovery
During
Construction
excavations, or other measures which are proposed to mitigate effects.
For Federal or Federally assisted undertakings, the Forest Service or other responsible agency will...
|
Site of Government Camp in foreground. North portion of contractor's camp across the river - air-port in the distance.
1934-06-27
2024-11-24 |