Record Details
Field | Value |
---|---|
Title | Installation of turbines and generators--stator being moved into place |
Creator | Fuller, H.W. |
Date | 1943-05-22 |
Description | Stator and bracket assembly for main unit L-6, weighing 335 tons, being lifted into its permanent position in bay 6. Two travelling cranes, with a lifting capacity of 375 tons each, are shown carrying the unit from its temporary point of assembly, between main units L-2 and L-3. |
Subject | Power plants--Washington (State)--Grand Coulee Dam--1940-1950; |
Coverage | United States--Washington--Grant County--Grand Coulee Dam Grand Coulee Dam |
Source | PG 94, Box 1, Installation of Turbines and Generators, 3 11233 |
Publisher | University of Idaho Library Digital Initiatives, http://www.lib.uidaho.edu/digital/ University of Idaho Library Special Collections and Archives |
Relation | Columbia River Basin Project Collection http://www.lib.uidaho.edu/digital/crbp/ |
Language | eng |
Type | Image;StillImage |
Format | image/jpg |
Rights | Material produced by the United States Army Corp of Engineers. In Public Domain. For more information, please contact University of Idaho Library Special Collections and Archives Department at libspec@uidaho.edu. https://creativecommons.org/publicdomain/mark/1.0/ |
Identifier | http://digital.lib.uidaho.edu/cdm/ref/collection/crbproj/id/1025 |