Installation of turbines and generators--stator being moved into place

University of Idaho Digital Collections

Field Value
Title Installation of turbines and generators--stator being moved into place
Creator Fuller, H.W.
Date 1943-05-22
Description Stator and bracket assembly for main unit L-6, weighing 335 tons, being lifted into its permanent position in bay 6. Two travelling cranes, with a lifting capacity of 375 tons each, are shown carrying the unit from its temporary point of assembly, between main units L-2 and L-3.
Subject Power plants--Washington (State)--Grand Coulee Dam--1940-1950;
Coverage United States--Washington--Grant County--Grand Coulee Dam Grand Coulee Dam
Source PG 94, Box 1, Installation of Turbines and Generators, 3 11233
Publisher University of Idaho Library Digital Initiatives, http://www.lib.uidaho.edu/digital/ University of Idaho Library Special Collections and Archives
Relation Columbia River Basin Project Collection http://www.lib.uidaho.edu/digital/crbp/
Language eng
Type Image;StillImage
Format image/jpg
Rights Material produced by the United States Army Corp of Engineers. In Public Domain. For more information, please contact University of Idaho Library Special Collections and Archives Department at libspec@uidaho.edu. https://creativecommons.org/publicdomain/mark/1.0/
Identifier http://digital.lib.uidaho.edu/cdm/ref/collection/crbproj/id/1025