Document: Appendix to Pacific Southwest Water Plan of August 1963 as modified January 1964 "Bonneville Power Administration Appendix", January 1964, page 1
1964-01-01
|
The Oregon State Game Commission report entitled, "The Fish and Wildlife Resources of the Hood Basin, Oregon, and Their Water Use Requirements" and this supplement to that report are designed to assist the State Water Resources Board with...
1973-04 (iso8601)
|
Correspondence, maps, and documents on the acquisition of Colville Indian Reservation land for Wells Dam Project by Douglas County Public Utilities District
|
Several physical and chemical characteristics of sediments have
been proposed for use in tiered testing plans to predict the
presence of trace metals in estuarine sediments. Correlations often
exist, but the mere presence of a trace metal does not...
1987-04-29 (iso8601)
|
Document: "Secretary Udall Moves," America, Febuary 13, 1965, page 3
1965-02-13
|
Document: Bridge and Marble Canyon Dams, Anthony Wayne Smith, August 30, 1965 (mimograph), page 1
1965-08-30
|
Image captions: Dairy farm near Ellensburg, Wash., Yakima project.
Harvesting oats near Ellensburg, Wash., Yakima project.
|
Document: Joint Statement of Reps. John J. Rhodes and Morris K. Udall, Sept. 1966, page 7
1966-09-01
|
This thesis presents a hydrogeologic study of the Parrett Mountain Region,
located approximately 20 miles south of Portland, Oregon. The aim of the study was
to investigate the impacts of Columbia River Basalt on the regional groundwater
system,...
2000-01-21 (iso8601)
|
As background, at the national level, for many years the U.S. Bureau of Commercial Fisheries concentrated on exploratory
fishing, gear development, food science, catch statistics, scientific research, and marketing, and serviced the commercial...
2001 (iso8601)
|
Document: Report to Utah from U.S. Senator Frank E. Moss, "Water for Utah and the West - Where Will We Get It?", May, 1964, page 2
1964-05-01
|
6,630,000 acres of land, of which about 2,260,000 acres are classed as plowable. Crops were harvested from 1,350,000 acres in 1939. The remainder of the plowable acreage was accounted for by about 486,000 acres of land where crop failure was...
|
Crops which were not fed to stock, but were sold or traded, had a value in 1939 of $11,902,000. Field crops, particularly potatoes, sugar beets, and specialized seed crops, accounted for the major share (S8,960,000) of this total, although the...
|
D. Project Costs
As shown on the attached Table 4, the cost of initial construction for the Snake-Colorado Project would be $945.7 million and the cost of the deferred expansion program $346.8 million, for a total construction cost of $1.293...
|
PERCENTAGE OF POPULATION IN TOWNS CENSUS YEARS 1900 -1940
TWIN FALLS-MINIDOKA-GOODING AREA
1900
1920
1940
SOURCE, 1900,'10, '20 FROM BUREAU OF CENSUS AND OTHER DATA, 1930 AND 1940 FROM CENSUS
FARM AND NON-FARM POPULATION
AND ACRES OF...
|
U.S. Atomic Energy Commission Contract AT(45-1)-1725 and Office of Naval Research Contracts Nonr-477(37) and Nonr-477(10) Project NR-083-012
2010-06-29
2010-06-29 1968-11-24 |
tional and regional economy, they will best serve those interests if made for purposes of enduring and continuing use. A public works program for the construction of permanent installations beneficial to the national economy is to be preferred...
|
United States Atomic Energy Commission, contract AT (45-1)-1725 and the Office of Naval Research, contract Nonr-477(10), project 083-012
2010-06-29
2010-06-29 1964-11-24 |
Unsolicited
2008-10-03
2008-10-03 1993-11-24 |
This report discusses major characteristics of western Oregon’s lowland rivers, streams, and estuaries that the IMST finds to be important to wild salmonids. IMST describes how landscape scale factors (landscape structure, landscape function,...
2002-07-15 (iso8601)
|
Modern wind energy is the technology of choice with a short payback period for increasing renewable energy portfolios. Bonneville Power Administration (BPA), a United States power authority in the Pacific Northwest expects to increase their wind...
2009-06-24T21:41:00Z (iso8601)
|
SUMMARY OF DEVELOPMENT PROGRAM
BYSTAGES AND SUBSTAGES
FIRST STAGE
Authorized but not
yet under construction
SECOND STAGE
Recommended for Authorization
Under Construction
Deferred
PERCENTAGE COMPARISON
NUMBER OF PROJECTS...
|