General view of excavation operations along bank
1936-11-01
|
Distance view of the future site of Grand Coulee Dam.
2024-11-25
|
View of machinery excavating the bank at the Grand Coulee site
1934-03-02
|
Repairs to highway bridge pier No. 2. Shows 36-inch I-beam inside steel caisson around pier and cuts in old concrete pier as keyways for additional concrete
1936-04-01
2024-11-25 |
Specs # 2329, Contract I2r 18156, Contractor, Morrison-Knudsen Company Inc. and Peter Kiewit Son's Co. View looking north showing progress made on pumping plant including office wing, parking area, gantry crane, and storage building P-9 through...
1950-09-25
|
UNITED STATES
DEPARTMENT OF THE INTERIOR
BUREAU OF OUTDOOR RECREATION
NORTHWEST REGION 1000 SECOND AVENUE SEATTLE, WASHINGTON 98104
Colonel A. R. Marshall Deputy Division Engineer North Pacific Division Corps of Engineers
210 Custom...
|
Looking up from pit #7 in West Powerhouse--natural illumination
1941-02-14
|
Subsection 5.D.3
The impact of water diversion for thermal plant cooling can be minimal or quite a problem, depending on individual circumstances.
Minimal impact would occur if irrigation water already being diverted were used for thermal...
|
Wheelpit R-8 looking downstream from 965 step. East Powerhouse base.
1940-09-25
|
View of the outlet works near the base of the dam. A man is standing in foreground for scale.
1941-06-26
|
View of the spillway section from the left bank
1941-03-03
|
LIST OF ADDRESSEES
INTERAGENCY REVIEW OF AREAS OF CONCERN
CR&T STUDY
Administrator
Bonneville Power Administration P.O. Box 3621
Portland, OR 97208
Regional Engineer
Federal Power Commission 555 Battery St., Rm 415 San Francisco,...
|
Portland District (Cont'd)
PI-53- John I. Frewing
PI-54- Henry G. Curtis
PI-55- Harry Paget
PI-56- Lewis R. Lembke
PI-57- Robert McNeil
PI-58- Kalama Sportsman's Club (Harry Fink)
PI-59- Marsh F. Beall
PI-60- Carl F. Koskela...
|
View of the construction on Grand Coulee Dam
1940-10-23
|
South Coulee Dam--Main Canal Headworks--A view of the headworks structure taken from approximately station 10+00 on the main canal; the main canal pipe crossing is shown in the immediate foreground
1949-06-08
|
LIST OF SOURCES
Federal
F-1 - Senator Len B. Jordan, Idaho
F-2 - Senator Bob Packwood, Oregon
F-3 - U.S. Fish and Wildlife Service
F-4 - U.S. Dept. of Agriculture - Forest Service, Missoula, Montana
F-5 - Bonneville Power...
|
Part of the assembly of thrust bearing for generator Shasta L-8 being lowered into position
1943-03-23
|
Winton-Utah Contract on West Canal under Specs. 1286. This view, looking east, shows (right to left) reinforcing steel being placed for Dry Coulee Siphon No. 1, the two invert forms, which fit inside the steel for placing concrete, and the outside...
1947-06-19
|
Source
PI-50 WI-70
WI-73 F-16
Tentative 1/ Disposition
A A
WI-70 C F-9, 14
Problem or Area of Concern
A. System-Project Operational Effects
1. If shoreline becomes a mud bank at low pool, it detracts from reservoirs' public...
|
Source PI-21
PI-96 F-17
PI-18
SI-73 C F-17
PI-21 F-17
Tentative Disposition
C F
Problem or Area of Concern
9.( Cont)The introduction of new varities should be very carefully considered. Often the new varieties are more...
|
Stator and bracket assembly for main unit L-6, weighing 335 tons, being lifted into its permanent position in bay 6. Two travelling cranes, with a lifting capacity of 375 tons each, are shown carrying the unit from its temporary point of assembly,...
1943-05-22
|
Placing the last section of the scroll case for L-7 turbine.
1947-03-10
|
96 pound block of concrete found in unit L-4 turbine runner, 3-20-44. The 7/8"" diameter hole in the foreground appears to have been an anchor bolt hole. Rectangular dimensions are 17"" x 11"" while wedge side dimensions are 17"" x 10"" x3""
1944-03-20
|