Map Symbol T1
Map Symbol T2
partnership is limited. The total estimated cost of development is $280,000, excluding land acquisition.
Hamilton Creek Trailhead
SITE DESCRIPTION: A trailhead in this area would provide
access to the...
|
Suitability Analysis
With this analysis, the demand for additional recreation opportunities is well documented. However, the Scenic Area Act requires development to be consistent with the protection and enhancement of the scenic, cultural, and...
|
1 map : col. ; 45 x 31 cm. or smaller. Relief shown by contours and spot heights. Title supplied by cataloger. Set includes various editions. "Surveyed in 1929-1930". "Contour interval 50 feet. Datum is mean sea level." "Edition of 1934". Highway...
2024-11-06
|
Label on verso: US WPA 542
WORKS PROGRESS ADMINISTRATION M-9;
STATE OF WASHINGTON; Date taken: April 19, 1939; Zone; County; City;
Title: Columbia River Clearance Project; Descriptive Caption: "Camp...
2024-11-06
|
The collection consists of correspondence, reports, designs, specifications, and photographs, relating to dams, dam sites, and hydroelectric power plants in Arizona, California, Idaho, Montana, Nevada, New Mexico, Oregon, Utah, Wyoming, British...
|
Document: Remarks of Honorable Wayne N. Aspinall before the annual meeting of the Colorado State Grange, October 1, 1966, page 13
1966-10-01
|
Hunting license, special tag, and duck stamp sales—Columbia River Basin
Hunting license Special tags Duck stamps
Type of permit
Number Value Number Value Number Value
Oregon, 1943:
Hunting licenses:
Resident 55, 401 $166, 203...
|
The current (1993-95) quality of shallow ground water inWillamette Basin alluvium is described using results from two studies. A Study-Unit Survey, or regional assessment of shallow groundwater quality in alluvium, was done from June through...
1997-11-06
|
Pine Creek Conservation Area (PCCA), just northeast of the John Day River in Wheeler County, Oregon, was acquired in 1999-2001 by the Confederate Tribes of Warm Springs with support from the Bonneville Power Administration (BPA), to mitigate for...
2013 (iso8601)
|
Document: Statement of the Irrigation Districts Association of California on the Pacific Southwest Water Plan Presented to the California Water Commission, November 1, 1963, page 2
1963-11-01
|
Image captions: Forested mountains cast of Coeur d'Alene, Idaho.
Mill of Ohio Match Co., on Spokane River near Post Falls, Idaho.
|
rapidly. Wide day-to-day fluctuations in temperature not uncommon at any season, are apt to be particularly marked during this spring period when late winter or early spring snowstorms may be followed by a "chinook," a dry warm wind which rapidly...
|
Summary of potential developments IRRIGATION AND DRAINAGE (ACRES)
New land
Gravity
Pumping
Project or unit
Supplemental water
Total area benefited
Bruneau 300, 000 100, 000 0 400, 000
Bruneau River 80, 000 0 0 80, 000
Grand View...
|
The Juniper Ridge volcanic complex is located in the High Lava Plains Province of
southeastern Oregon, a wide zone of bimodal volcanism and faulting that marks the northern
limit of widespread Basin and Range-style faulting in the northern Great...
1994-02-17 (iso8601)
|
the district is reached. Where the waterway is a river, the list proceeds up the left bank of the stream to the first tributary, thence up that tributary, and even up the tributaries of the latter, in the same manner, the return to the mouth of...
|
river. The consequence of taking that buffet on the beam was quite a merry bit of a mix-up. The shower-bath of blown spray and the dipping under of the lee rail were rather the least of my troubles. What did have me guessing for a minute, though,...
2004-08-24
|
The river narrowed sharply above Rock Creek, and, standing on a thwart as the skiff drifted down, I saw that the rapid dropped away in a solid stretch of white foam tumbling between black basaltic walls. There was a good, stiff fall, but it was...
2004-08-23
|
The Snake River strain of sockeye was declared endangered in 1991 in response to the decline in the number of anadromous adults returning to nursery lakes in the Snake River watershed. These fish historically migrated over 1,400 km from the...
1994-01-01
|
2508 REPORT OF THE CHIEF OF ENGINEERS, U. S. ARMY.
cylindrical boilers ll-j% feet long by 11J feet diameter; working steam pressure, 80
pounds.
Engines.—High-pressure: Diameter of cylinder, 40 inches; length of stroke, 54
inches ;...
2006-06-16
|
REPORT OF LIEUTENANT WILLARD YOUNG, CORPS OF ENGINEERS.
UNITED STATES ENGINEER OFFICE, Cascade Locks, Oregon, June 30, 1884.
SIR : I have the honor to submit the following report upon the operations conducted during the year ending June 30,...
|
on the fringes of the movies knows, the temperaments of both stars and directors are things that require frequent harrowing to keep them in good working order.
Roos' filming of the unloading of the boat was the best thing he did on the trip....
2004-08-05
|
most of the time, for I often saw spray thrown ten or fifteen feet to either side and twice as far astern. All hands were drenched from the moment we struck the first comber, of course, which was doubtless why a wail from Roos that the water was...
2004-08-09
|
Completed trashrack structures for the right group of penstocks.
1940-07-31
2024-11-06 |