Results

4226 - 4250 of 5942 Items    << < 165 166 167 168 169 170 171 172 173 174 > >> 
Thumbnail
Title
Description
Dates
Image captions: Sailing on Coeur d'Alene Lake, City of Coeur d'Alene in background. Kootenai River about 10 miles west of Libby, Mont.

velopment attendant upon the extension of irrigation by means outlined subsequently. As required and justified, the irrigated acreage can be ultimately extended to more than twice its present size, expanding tremendously the economy of the whole...

Central Snake "In sharp contrast to the prime importance of the Snake River in the Upper Basin, the waters of that stream are virtually unused in the Central Basin at present. Here, irrigation and power development are based almost wholly on...

TABLE OF CONTENTS Page Introduction 1 Objectives and Scope 2 Summary 3 I. The Pacific Southwest Water Plan 7 II. The Snake River - An Alternate Water Supply 11 III. Snake-Colorado Project 13 A. Description 13 B. Power Consumption and...
and so the money must be poorly managed. Others are concerned that no single entity has responsibility for these investments and so no one can be held accountable. Some think that True Science, if we would only let it loose, would tell us exactly...

The new Bureau of Reclamation mixing plant, erected near the large waste-sand pile on the east side of the river to supersede the contractor's plant. A two-yard, double-cone, tilting-type mixer will discharge batches through the floor into trucks...
1942-11-19
2024-11-06
A section of the relocated State Highway No. 22, south of Marcus, Washington.
1941-07-29
2024-11-06
RIVER AND HARBOR IMPROVEMENTS. 1405 Based on experience in building the south jetty extension a revised estimate of $5,966,573 for constructing the north jetty was approved July 18, 1913. It is based on an assumed crest width of 40...
2006-06-16
Stream classification provides a means to understand the diversity and distribution of channels and floodplains that occur across a landscape while identifying links between geomorphic form and process. Accordingly, stream classification is...
2016-03-16
The contractor's setup for concrete placing at pier No. 1 of the Kettle Falls railroad bridge. The first five-foot lift of concrete has been poured on bedrock, and formwork has been completed for the second lift.
1940-07-25
2024-11-06
comfort of travelling with Blackmore. In all matters pertaining to river work his judgment appeared to be beyond criticism. If he was tackling a stunt with a considerable element of risk in it, that was his own business. No one else knew the...
2004-08-09
stable channel, and 30 feet are desirable for the deep vessels needed by the Columbia River trade, on account of the heavy seas of the locality. The amount expended on the project to June 30, 1855, is $59,370.70. Operations have consisted in...
2006-02-28
APPROPRIATIONS TO DATE. Act March 3, 1871 $16, 000 06' Act March 3, 1873 3, 000 00 Act June 23, 1874 7,500 00 Act March 3, 1875 25, 000 00 Act August 14, 1876 20, 000 00 Act March 3, 1879 12,000 00 Act June 14, 1880 12,000...

gave me the photographs of Kettle Falls which I am using as illustrations. After leaving Marcus a short run landed me at the head of the Falls. The River valley is wide here, and not enclosed by high hills. The higher shore is on the right, but...
2004-07-19
Increasing pumpage rates and declining ground-water levels in the Columbia River Basalts of the Pullman-Moscow area of Washington and Idaho indicate a need for ground-water management. A three-dimensional numerical computer model of ground-water...
1987-04-01
Elevation 950 diversion slot in block 13. Octagonal 12-ft. diameter blockouts are for 6-ft. diameter station-service unit penstocks.
1937-05-01
2024-11-06
Bulldozer Jockeys have a special technique for flood fighting. It is a double action procedure of moving their equipment out into the flood stream bed and with the bulldozer blade widening the stream channel, at the same time pushing the blade...
1964-11-06
View from of excavation taken from across the river. Structures visible in the foreground.
1934-04-02
Removing walls of east side cofferdam by burning (Wakefield piling)
1936-12-01
2024-11-06
Highway bridge with pier No. 2 repairs almost completed.
1936-05-04
2024-11-06
Batcher control equipment in Eastmix. Graphic record instrument on the right.
1936-06-01
2024-11-06
The two blending silos at cement storage yard.
1936-06-01
2024-11-06
Feeder and collecting conveyors at elevation 1840 in Brett pit.
1936-04-01
2024-11-06
Source Tentative Disposition PI-53 C Problem or Area of Concern 2. (Cont) more often. Such blocks are apparently due to temperature differences which exist between the main river and the tributary stream into which the fish are headed....

2005-10-13
4226 - 4250 of 5942 Items    << < 165 166 167 168 169 170 171 172 173 174 > >> 

© Western Waters Digital Library - GWLA member projects - Designed by the J. Willard Marriott Library - Hosted by Oregon State University Libraries and Press