Results

3951 - 3975 of 5942 Items    << < 154 155 156 157 158 159 160 161 162 163 > >> 
Thumbnail
Title
Description
Dates
Columbia Basin Project, Irrigation Division. Corn crop at Moses Lake Predevelopment Farm. A.W. Bauman, photographer
1947-08-12
View showing automatic siphon on Pasco Pump Lateral system, PP-6.0 Sta. 52+00. This feature constructed by J.A. Terteling and Sons, Inc., Specifications 1230
1947-09-06
View showing equipment and placing of 1 1/2 inch thick pneumatically applied mortar lining on Pasco Pump lateral system PP-6.0-0.5 lateral vicinity sta. 4+00. This section is under construction 10 to 15 miles northwest of Pasco, Wash. By J.A....
1947-04-02
To Mr. J. R. Farish, editor of the Commercial Reporter, of Portland, I am indebted for the following information, forwarded in a letter to me: "The British ship Ben. Rhydding, dispatched by Messrs. Rodgers, Meyer & Co., cleared from this port...

Columbia Basin Project, Irrigation Division, Specifications No. 2324, Schedule 2, Long Lake Dam Headworks and Concrete Canal Lining and Structures Station74+80 to Station 1101+29.00--Main Canal. Contractor: Western Contracting Corp. Front view of...
1949-09-15
Columbia Basin Project, Irrigation Division, Winchester Wasteway, Specs. 2648. Mixer truck discharging concrete into a 'laydown type' bucket during the first concrete pour in the chute and stilling pool section in the vicinity of Sta. 38+00. The...
1950-04-10
Mouth of \Willamette do 234 110 -17.5 4, 600 Saint Helen's Bar, (new cut)- Columbia River 600 3, 750 do (t)September 12 to October 8, 1874, moved dredger to Post Office Bar. Previous examinations made of all the bars preparatory to...

Columbia Basin Project, Irrigation Division, 2nd section West Canal, Specs. 2541. Contractors employees erecting the Guntert and Zimmerman trimmer at about station 1045. This view shows the back of the machine. Work is being performed by...
1950-03-21
Columbia Basin Project, Irrigation Division, 2nd section West Canal, Specs. 2541. 54-B shovel is loading 10 yard Euclid trucks with rock from the G.N.R.R. crossing plug at the station 1043/20. Water in the canal came from snow melt and sub-surface...
1950-05-21
Columbia Basin Project, Irrigation Division I, Bacon Tunnel, Specification 1236, T.E. Connolly Inc., Contractors. Photograph toward tunnel portal from Station 186+44, showing both unsupported and timbered tunnel from Station186+50 and Station 187+10.
1947-03-13
Source Tentative Disposition Problem or Area of Concern 1. (Cont) COMMENT: Analysis of system and project operation effects on wildlife will be a continuing part of the CR&T study. A research program already has been developed through...

Columbia Basin Project, Irrigation Division, 3rd Section East Low Canal, Specs. 2879. Defective concrete removed on pin bearings, Weber Wasteway Turnout Sta. 1951+00, East Low Canal. Anchor bolts welded to re-steel for additional strength. Work is...
1950-10-31
Department of the Interior. Bureau of Reclamation. Columbia Basin Project--Washington. Columbia River Dam Excavation Plan and Sections Schedule No. 2
1933-10-18
2024-11-25
Lower Columbia "Tidewater locations plus the availability of vast amounts of hydroelectric power from Bonneville and Grand Coulee Dams have made for a tremendous expansion of war industries in the lower Columbia Basin, particularly in...

Research materials created by Ivan Donaldson, co-author of the book "Fish wheels on the Columbia," published in 1971.; Research materials created by Ivan Donaldson, co-author of the book "Fish wheels on the Columbia," published in...

[unrelated material omitted] DEFENSES OF THE COLUMBIA. Defenses at the mouth of the Columbia River, Oregon, and Washington Territory, in charge of Capt. C. P. Powell, Corps of Engineers.—The defenses consist of Fort Stevens, an inclosed...
2006-03-23
which I was supposed to be striding was really on my left, but Roos explained that some sort of a movie Median law made it imperative always to exit to right.) Then we went over to make the cabin shots. The owner of the cabin was away at the...
2004-08-05
were likely to learn from a distance, I decided to start north at once to see what could be arranged on the ground. Victoria yielded little save some large scale maps, and even these, they assured me in the Geographic Department of the B. C....
2004-08-04
MORRISON STREET BRIDGE. No work has been done during the year on this unfinished structure, either to remove the parts already built or to complete the bridge. A proposed bill, giving consent of the United States to the completion of the bridge,...

ment was, that after climbing the hillside he was hurrying along the trail, and just before reaching the cabin, Queen came bounding up the hill, through the brush, none the worse for her experience; and like myself, thinking she might be hungry he...
2004-07-14
Columbia Basin Project, Irrigation Division, 2nd Section West Canal, Specs. 2541. Looking across the canal at the completed drain inlet at station 1175+44. Work is being performed by Morrison, Knudsen, Inc. under Schedule 2 of above...
1950-06-16
These were the first grouse I had killed since shooting the one on Blackwater trail, and that evening I had a nice "mulligan" for supper. For three days I walked hack each morning to Smith's camp, to see if Emond had returned, but he did not...
2004-07-12
3951 - 3975 of 5942 Items    << < 154 155 156 157 158 159 160 161 162 163 > >> 

© Western Waters Digital Library - GWLA member projects - Designed by the J. Willard Marriott Library - Hosted by Oregon State University Libraries and Press