Record Details
Field | Value |
---|---|
Title | page 2004 |
Relation | gov serial set 2185 |
Date | 2006-02-13 to 2006-02-20 |
Rights | This item is in the public domain. Acknowledgement of the University of Oregon Libraries as a source is requested. |
Format | Scanned from originals using Silverfast AI 6.0 on UMAX Powerlook III flatbed scanner. Scanned images saved as 16 bit grayscale tiffs. Omnipage 14 used to OCR 8 bit tiffs and generate text files for full text access. 16 bit grayscale and 48>24 RGB color tiffs edited in Photoshop CS 8.0: cropped, rotated, reduced in size, levels adjusted, grayscale bit depth reduced to 8 and JPEGs created. |
Description | MORRISON STREET BRIDGE. No work has been done during the year on this unfinished structure, either to remove the parts already built or to complete the bridge. A proposed bill, giving consent of the United States to the completion of the bridge, referred to me for remarks, was returned with indorsement June 16, 1882. An examination was made of the piers at time of low water, and sound. ings were taken during the present slack water by Assistant Engineer Habersham. He reports to me that... |
Identifier | http://oregondigital.org/u?/wwdl,3471 |