Results

3701 - 3725 of 5942 Items    << < 144 145 146 147 148 149 150 151 152 153 > >> 
Thumbnail
Title
Description
Dates
THIS edition of THE COLUMBIA RIVER is issued in advance of its publication as a Congressional Document in response to an urgent public demand for copies, many of them official review. The document has not been transmitted to the Congress for...

Improvement of Mouth of the Columbia River. Survey made June 1899. Soundings were taken June 7 -- 28, 1899, and are expressed in feet, and show the depth at the average of the lowest low waters. Position of buoys are as on June 28, 1899. U. S....
2005-01-24
2868 EEPOET OF THE CHIEF OF ENGINEERS, U. S. ARMY. water; this can be done with a layer of fascines 9 inches thick, covered with rock to a depth of 18 inches. I estimate that the cost of this work will be approximately as follows,...
2006-06-16
Capt. Arthur Williams, 10, 951. Maj. Jay J. Morrow, 10, 951. Assistant. Capt. Arthur Williams, 09, 856; 10, 951; 11, 1007. OPERATIONS. 1907-08. 51 snags and trees removed from chan.; 295 trees cut from banks, 08, 2278. 1908-09. 195...

SUPEEVISION OF THE HAEBOE OF NEW YOEK. 395 3. Columbia River, from the mouth of Willamette River to the upper limits of the city of Vancouver, Washington, with a view of establishing a ship channel.—The improvement proposed...
2006-06-16
the course of a single "circular" trip by packtrain. To my great regret, it was not practicable to get an outfit together in the limited time at our disposal. The best we could do so late in the season was a hurried run up to Rainbow Falls, a most...
2004-08-16
The Oregon Sea Grant Communications Videotapes and DVDs consist of multimedia recordings either created or collected by Oregon Sea Grant staff. The materials generally concentrate on topics related to ocean research, marine resources and coastal...

service and for establishing water-gauges at points above Astoria on the Columbia River and on its principal tributaries. Money statement. July 1, 1883, amount available $48 52 July 1, 1884, amount expended during fiscal year, exclusive of...

Memoranda, reports, and planning documents re: Program 208 in Washington's dryland regions, a facet of a national water quality management program conducted by the United States Environmental Protection Agency.; Felix Entenmann was the...

Abstract of proposals for furnishing piles at Point Adams, "Improving mouth of the Columbia River," opened by First Lieut. Edward Burr, Corps of Engineers, for Capt. Charles B. Powell, Corps of Engineers, January 30, 1885. [Delivery to...

PP13. GAUGING WATERS OF THE COLUMBIA RIVER FROM ASTORIA TO THE BAR. The act of August 2, 1882, is the first appropriation for this work. A self-registering gauge was set up at Astoria in February, and has been operated since, and...

Number of times the wind was observed blowing, 4c-Continued. 1881. Point. January. February. March. April. May. June. July. August. September. October. November. December. N 7 1 2 8 8 6 20 22 10 7 5 NE 11 3 1 0 1 2 1 0 2 0 2 1 3 E 19...

Unrelated material omitted
IMPROVEMENT OF RIVERS AND HARBORS IN OREGON AND IN WASHINGTON TERRITORY—IMPROVEMENT OF LOWER CLEARWATER RIVER, IDAHO—CONSTRUCTION OF CASCADES CANAL, COLUMBIA RIVER. Officer in charge, Maj. G. L. Gillespie,...
2006-01-03
October 30, and on October 31 a full report was forwarded. The land required, 47.32 acres, was claimed to be owned by the Oregon Steam Navigation Company, who offered to sell it at the rate of $200 per acre, reserving-to themselves the right of...

Boundary; and navigated it, from Grand Rapids to Snake River, in a 30-foot batteau with a crew of four Indians and a Canadian half-breed called Old Pierre. His published report gives his experience at what is now known as Box Canon. "Every...
2004-07-07
Mason City in the foreground--contractor's general office building at extreme left, mess hall and camp office, auto parking space, men's quarters, commercial section and hospital, Mead Circle and residence section. Columbia River highway bridge...
2024-11-26
2024-11-26
The following is a statement of the moneys expended and available for this improvement during the fiscal year : Available July 1, 1872 $50, 000 00 Expended : Removal of rocks $19, 296 69 Superintendence, office expenses, &c 2, 488 98...

for the deck. For a distance of 180 ft. on the Highway above Bonneville it was found to be cheaper to carry the road partly on a concrete viaduct and partly on the solid rock roadbed, rather than to cut the full road bed out of the vertical rock...
2004-06-17
MASTER PLAN - An overall plan for reservoir shoreline protection, development, and management with allowances for recreation, industry, transportation, and any other relevant usage. MODIFIED STREAMFLOW - Streamflow as modified by use of...

forty-five horse-power per ton per twenty-four hours. The labor cost is stated at $4.50 per ton, and the initial cost of plant at $13,000 per ton daily capacity. Besides its use as an absorbent, wood flour is used as a filler for linoleum and in...
2004-03-02
3701 - 3725 of 5942 Items    << < 144 145 146 147 148 149 150 151 152 153 > >> 

© Western Waters Digital Library - GWLA member projects - Designed by the J. Willard Marriott Library - Hosted by Oregon State University Libraries and Press