The Oregon Fish Commission funded a seal control program on the Columbia River from 1936-1971. There were bounties offered and a professional hunter hired for periods. This 1972 report reviews the program and found it ineffective.
1972-03-09 (iso8601)
|
APPENDIX U U----REPORT OF MAJOR HANDBURY.
2817
KROM RECORDS OP THE MERCHANTS' EXCHANGE, PORTLAND, OREGON.
Registered tonnage inward over Columbia River Bar from June SO, 1891, to June 30, ISO;.
Month.
Deep-8oa...
2006-06-16
|
VV 90 Boise R., Idaho (84)
VV 91 Weiser R., Idaho (84)
VV 92 Salmon R., Idaho (84)
VV 93 Clearwater R, Idaho (84)
VV 94 Clearwater R., South Fork, Idaho (93)
VV 95 Clearwater R., Middle Fork, Idaho (93)
VV 96 Clearwater R., North Fork,...
|
treacherous swirls and eddies of Revelstoke Canyon were not the last of swift water by a long shot. Just below the defile of the Arrow Lakes the white caps began to rear their heads again, and from there right on down through the seven hundred...
2004-08-03
|
Photographs of
Tacoma buildings and locations, Madison Beach Pavilion in Seattle, ships in
Portland, Oregon harbor, and Oregon scenic views; 23 photographs in one album depict buildings and locations in Tacoma,
including St. Peter's...
|
The 1939 flood stage of the Columbia River is diverted over low blocks in the spillway section of Grand Coulee Dam. Concrete placing, which is in progress on either side of the spillway, will be resumed therein when the flood waters subside. To...
1939-05-23
2024-11-05 |
The lecturer at the Government's West Vista House displays a model of the west cofferdam and west portion of the dam in the river diversion stage of construction.
2024-11-05
2024-11-05 |
Papers of a
fisheries biologist in charge of the design for fish protection at Bonneville
Dam; Harlan Holmes was born in 1898. He was the fisheries biologist in
charge of the design for fish protection at Bonneville Dam. He received...
|
Image Caption: CELILO FALLS --page break-- channels, and in one place a single channel about 175 feet wide carries the whole volume of the River's flow. The walls of the gorges thus formed are about 25 or 30 feet high, and between them the water...
2004-07-20
|
PASSING BENEFITS OF COLUMBIA RIVER POWER TO CONSUMER
Only the lowest RETAIL rates economically possible can give each community the full benefits of Bonneville-Grand Coulee power.
The rates which have been adopted by Forest Grove and Canby...
2004-06-28
|
gravel. Giant-powder was indispensable at this point, as well as at other places. Two hundred and eighty snags were removed during the working-season. Last year the snag-boat failed to remove many snags and stumps, which were removed during the...
2005-08-15
|
Source WI-71
WI-18, 35 PI-50 PI-21
Tentative Disposition
WI-1, 4, 16, 68 F SI-44
PI-4, 17, 21, 50
F A
Problem or Area of Concern
9. Need to maintain good cultural practices on the land to enhance the quality of human life.
10....
|
41 degree, cast steel elbow, installed between penstock reducer section and needle valve in bay R-9 of the right powerhouse at Grand Coulee Dam. Eight needle valves, each having an 84-inch discharge, are being installed in the right powerhouse....
1945-01-02
|
Source
Tentative Disposition
SI-32, 35, 80 F F-7
PI-59 C
Problem or Area of Concern
l. (Cont) COMMENT: Numerous studies have been made concerning the carrying capacity of recreation areas and reports are available describing space...
|
Source WI-69 WI-69 I-2 F-11
C
C
WI-61 F-11
Tentative Disposition
A
Problem or Area of Concern
3. Study withdrawals from Lower Snake and Columbia Rivers.
COMMENT: Corps is studying in connection with issuance of permits for...
|
Government camp - basement of Administration Building in foreground. Mason City across river.
1935-02-26
2024-11-05 |
Excavation and conveyor system behind east cofferdam, cross river conveyor trestle, upstream end of west cofferdam and main line of conveyor to spoil pile in Rattlesnake Canyon. Top of picture shows cement silos.
1935-11-04
2024-11-05 |
Map Symbol Ot3
Map Symbol Ot4
trail bridge will be required at Bridal Veil Creek. The proposed trail would cross private land in several areas.
DEVELOPMENT SCENARIO: The land is primarily in either private
or State Park ownership. Since...
|
Map Symbol A8
DEVELOPMENT PROPOSAL: Facilities will be constructed for
boating, launching and moorage, as well as for picnicking, interpretation, general day use, and scenic appreciation. The facilities will accommodate 350 people at one time....
|
Pre-field
Literature
Review
Field Inventory
The preliminary review of the literature shall include the following sources of information:
1. A statement as to the presence of any historic or prehistoric cultural resources or...
|
Master scanned with Epson 1640XL at 800 dpi. Image manipulated with Adobe Photoshop 7.0.
|