what manner and what portion of the river the funds available should be applied. His report thereon has not been received. When received, if approved, immediate steps will he taken to prosecute the work.
By command of Brigadier General...
|
Part of cells in section "H" of west cofferdam removed for river diversion. East shore-end of cross-river timber crib cofferdam at the left - east end of concrete placing trestle across the river and to its right is shown low Wakefield pile...
1936-08-01
2024-11-04 |
Mouth of Bear Canyon Creek where it flows into Tilton River
It is impassable to fish
1936-10-20
|
75 foot series of falls on Timonium Creek near its confluence with the North Fork of the Cispus River
Indicates terrific flood stages
1937-08-03
|
Lower Cowlitz Falls eight miles below Randle, Washington
The falls are 4 feet high and are not a barrier for fish
1936-10-24
|
10 DEOISilQNS'PERTINENT TiO! PROPOSED' WATER RIGHTS' ACT all we are called on to decide, this opinion must be understood to be confined. It does not extend to the question what other subjects, under the commercial power, are within the exclusive...
2009-04-01
|
during the irrigation season and as a pumped-storage plant from November through March on a daily or weekly cycle. However, this plan is dependent on additional upstream storage at Twin Springs Reservoir, on the North Fork Boise River, and this is...
|
Document: Opinion of the U.S. Supreme Court, June 3, 1963 (photocopy), page 1
1965-02-23
|
Approximately 5,500 years ago a discreet period of
wetter and cooler environmental conditions prevailed
across the southern Columbia Plateau. This period was
marked by the first prominent episodes of erosion to occur
along the lower Snake River...
1994-09-29 (iso8601)
|
Document: 87th Congress, 1st Session, House of Representatives, Public Works Appropriation Bill, 1962, September 6, 1961, page 26
1961-09-06
2006-09-19 |
KEY MAP
EXPLANATION
IRRIGATED LAND
SUPPLEMENTAL IRRIGATION POTENTIAL IRRIGATION PROJECT EXISTING RESERVOIR
RESERVOIR SITE
SUBDIVISION BOUNDARY
WATER POWER PLANT (1,000 mp CAP,OR MORE) POTENTIAL POWER PLANT
WATER RESOURCES DEVELOPMENT...
|
VV-84 SNAKE RIVER, OREG., WASH., AND IDAHO.
Part. Title. Period. Appropriations.
a Snake R. (above Lewiston) 1881-1885
b Snake It., Asotin to Pittsburg Landing 1899-1900
c Snake R. (upper) 1890-1896 $45,000.00
Total 45,000.00...
|
OHIO RIVER SYSTEM.
District. Page.
AA. Chattanooga and Nashville, Tenn 843
BB. Louisville, Ky 889
CC. Cincinnati, Ohio (Ohio River) 905
DD. Cincinnati, Ohio, No.2 957
EE. Wheeling, W. Va 981
FF. Pittsburgh, Pa 1001
MISSOURI RIVER...
|
Railroad and county road bridges across the gorge at the mouth of the Kettle River.
1941-12-09
2024-11-04 |
for the night. As there was a couple of feet of "lop" even there, this was rather a nice operation. With lines to stern and bow, and held off from the rocks on either side by lashed pike-poles, she looked for all the world like some fractious...
2004-08-09
|
mitted. The borings show that there is not very suitable lock foundation at the head of the canal, but a fair foundation exists for two locks near the middle part of the canal location, where it is now expected to place them, making the locks...
|
First quarter 1881:
Hired labor $23,281 94
Materials 2,549 80
Transportation 808 69
Telegrams, traveling expenses, &c 101 69
$26,742 12
Second quarter 1881:
Hired labor 23,966 46
Materials 2,144 38
Transportation 199 73...
|
The Wesley A. D'Ewart Collection contains campaign materials,
speeches and writings, correspondence, and research materials accumulated by Mr. D'Ewart.
Subjects include campaign materials and election returns pertaining to the...
|
The block 62 fishway, showing the derrick used for adjusting the fish ladder weirs. The weirs were adjusted as required by changes in the flow of the river.
1938-05-09
2024-11-04 |
4 p. Selected pages of the Report of the Chief of Engineers for 1878. Included are annual reports detailing improvements of rivers in Oregon and Washington territory.
1878-11-04
|
5 p. Selected pages of the Report of the Chief of Engineers for 1876 covering improvements of rivers in Oregon and Washington territory.
1876-11-04
|
Upstream view of dam and elevation 1024 trestle. Suspension bridge with its center tower. Lower end of diversion channel in lower right corner. Down-stream cross-river cofferdam has been removed.
1937-12-21
2024-11-04 |
Colonel A. R. Marshall April 3, 1974 Page Four
6C-11 [12]- Disposition seems appropriate.
6C-13,14 [12,13].- These concerns seem appropriate for consideration in
CR&T, on the basis of the probable interrelationship between system...
|