Feeder Canal. Specs. 2586. J.A. Terteling and Sons Inc., Contractors. This photograph was taken on the extreme west end of the Electric City Storage Yard. The sub-contractor, the Steel Construction Co., who have the contract with J.A. Terteling...
1949-08-16
|
Subsection 2 .E.4 [2D6]
The problem with which Subsection 2.E.4 [2D6] deals is the necessity of consuming fuel at time of peak load even though there is a spill of hydroelectric energy during off peak hours of the same day. As
recognized in...
|
Close up view of men working on eastern spillway arch.
1941-07-15
|
believe that very careful consideration must be given to the establishment of land use controls within the Hanford Reach so as not to preclude further development of the Hanford Project, particularly its potential for development of a Nuclear...
|
Men stand on girder during drum gate construction
1941-01-21
|
V COMMENTS BY OTHER FEDERAL AGENCIES Note: Some revisions were made in the organization of concerns within the various sections after agency reviews were requested. Reference numbers in the agency comment letters have been revised to reflect...
|
Men align drum gate hinges
1940-11-30
|
Walla Walla District (Cont'd)
WI-66- Robert W. Heines, SCS
WI-67- Everett R. Hagen
WI-68- Clarkston Social Work Group
WI-69- Clarkston Economic Work Group
WI-70- Clarkston Environmental Work Group
WI-71- Richland Social Work Group...
|
Aerial view of construction of Grand Coulee Dam
1940-06-03
|
Seattle District (Cont'd)
SI-16- Thomas H. Rogers
SI-17- Win M. Self
SI-18- Washington Rural Electric Cooperative Association
SI-19- Trout Unlimited
SI-20- American Institute of Architects (Spokane Chapter)
SI-21- Charles E. Trotta...
|
Image Captions:
Near Oneonta Gorge, where great cliffs almost smother a vigorous stream, there is a short tunnel through the solid rock. The highway sweeps now at a low level near the river's edge, now high on a hanging cliff, a road of...
2004-03-02
|
Feeder Canal. This photograph was taken at about station 75+15 in the invert of the outlet open transition of the cut-and-cover looking east at the downstream end of the barrel section. The contractor is erecting forms, and placing reinforcing...
1950-05-26
|
Source
WI-6, 7, 8, 13, 14, 15, 17, 18, 19, 21, 23, 26, 29, 34, 35, 39, 50, 70
SI-74
Tentative Disposition
E
PI-2, 50, 51, 56 F
E
Problem or Area of Concern
3. Build no more dams without comprehensive study and approval of...
|
Huge wicket gates stored on generator deck is wiped off by H.R. Ramm, U.S.B.R. foreman.
1947-06-28
|
Source
Tentative Disposition
PI-105 F
WI-70 F
SI-73 F
WI-70 F
Problem or Area of Concern
l. (Cont) F. On-site compensatory techniques
1. To test potential means of compensation for lost habitat and possibilities of success by...
|
The spider for the L-7 generator, after being heated to cause it to expand, is being lowered onto its shaft. It is partially covered with canvas to keep it warm until it is in place.
1947-06-27
|
Col. Basin Proj., Grand Coulee Dam.--Lowering the turbine runner for the No. 1 Shasta Dam generator, of 75,000 kw. Capacity, moved to Grand Coulee Dam with another machine of like size to expedite delivery of new power to Pacific Coast war...
1942-10-15
|
A view of the east end of the left powerhouse, with turbine pit No. 6 in the immediate foreground
1942-11-28
|
A close up view of bolts in a concrete wall
1938-02-01
|
Left to right, shows steel cells in cluster "G" of west cofferdam, timber-crib plug to block 40 and steel cells in cluster "D. Bedrock excavation west of structure.
1936-04-01
2024-04-29 |
Sample core of Grant; showing seam
2024-04-29
|
Govt. inspector filling cylinder with concrete sample at a plant for compression braking test
1940-07-26
|
Problem or Area of Concern
(Cont) COMMENT: The following discussion supplied by BOR is applicable to items 3-8, above.
On projects which they operate and hold fee title to the lands adjacent to the reservoir, the Corps of Engineers'...
|
air compressors in power house
1941-09-10
|