Results

101 - 125 of 431 Items    << < 1 2 3 4 5 6 7 8 9 10 > >> 
Thumbnail
Title
Description
Dates
Department of the Interior: Bureau of Reclamation; Columbia Basin Project-Washington Grand Coulee Dam Government Camp - Three Room Residence Type 2 Floor Plans & Sections
1934-05-29
2024-05-02
Department of the Interior: Bureau of Reclamation; Columbia Basin Project-Washington Grand Coulee Dam Government Camp - Three Room Residence Type 1 Elevations
1934-05-29
2024-05-02
Department of the Interior: Bureau of Reclamation; Columbia Basin Project-Washington Grand Coulee Dam Government Camp - Grade School Floor and Roof Plans
1934-08-06
2024-05-02
Department of the Interior: Bureau of Reclamation; Columbia Basin Project-Washington Grand Coulee Dam Government Camp - Grade School Exterior Elevations
1934-08-06
2024-05-02
Department of the Interior: Bureau of Reclamation; Columbia Basin Project-Washington Grand Coulee Dam Government Camp - Grade School Plot Plan
1934-08-06
2024-05-02
Department of the Interior: Bureau of Reclamation; Columbia Basin Project-Washington Grand Coulee Dam Government Camp Three Room Residence Type 3 Elevations
1934-05-29
2024-05-02
Columbia Basin Project Safety News is a monthly publication issued to employees of the Columbia Basin Project informing them of accidents, safety regulations, and day to day activities on the Grand Coulee Dam construction site.
2024-04-02
2024-05-02
Department of the Interior: Bureau of Reclamation; Columbia Basin Project-Washington Grand Coulee Dam Government Camp - Three Room Residence Type 3 Floor Plans & Sections
1934-05-29
2024-05-02
Columbia Basin Project Safety News is a monthly publication issued to employees of the Columbia Basin Project informing them of accidents, safety regulations, and day to day activities on the Grand Coulee Dam construction site.
2024-02-02
2024-05-02
Department of the Interior: Bureau of Reclamation; Columbia Basin Project-Washington Grand Coulee Dam Government Camp - Three Room Residence Type 2 Elevations
1934-05-29
2024-05-02
Department of the Interior. Bureau of Reclamation. Columbia Basin Project--Washington. Grand Coulee Dam Area, Capacity, and Discharge Curves
1934-04-16
2024-05-02
The Brett Gravel Pit, and the gravel processing plant. The huge sand pile, estimated at 4,000,000 cubic yards, is the surplus sand which has been wasted here after the gravel and cobbles were removed. In the foreground is the Mason City Airport.
1938-04-25
2024-05-02
Sealing rock in foundation for block 39.
1936-07-17
2024-05-02
Grand Coulee Dam Concrete Mixing Plant

2024-05-02
The contractor's main aggregate conveyor. Its capacity is rated at 2,750 tons per hour, and it is about 5,000 feet in length.
1938-09-21
2024-05-02
Sump from cofferdam with outlet pipes and spillway. North end of block 40 at the left, and cluster "G" to the right.
1937-04-01
2024-05-02
West cofferdam nearing completion. Excavation spoil conveyer in upper left hand corner. Contractor's cast field office, warehouse, and machine shop in foreground.
1935-02-26
2024-05-02
At Consolidated Builders' sand classifier plant, the Toledo scale, with chronoflow recording attachment, weighs the quantity of sand produced. Each of the three scales is attached to a conveyor belt which carries sand of one size range.
1938-08-26
2024-05-02
This is the X-Ray machine used to examine the welds of the steel penstock liners after they were fabricated in the shop of the Western Pipe and Steel Co. at Electric City, Washington, a few miles west of the dam site in the canyon of the Grand...
2024-05-02
A part of the Brett Gravel Pit as it appeared in April of 1940. Buggies, drawn by tractors are supplementing the lateral conveyors in moving material to the main belt which is seen here discharging into the raw stockpile. About 75% of the gravel...
1940-04-01
2024-05-02
The Dorr hydro-separator installation at the contractor's sand classifier plant.
1938-08-26
2024-05-02
Berm of Gravel west of section "E" of west cofferdam transported by conveyor from east side pit and placed by 36-inch belt, material diverted at suspension bridge tower.
1936-03-31
2024-05-02
Wood trestle used in driving west cofferdam. Lower right corner is contractor's catwalk across Columbia River
1935-01-30
2024-05-02
At the contractor's sand classifier and dewaterer discharges the sand fraction to a conveyor belt.
1938-08-26
2024-05-02
Lower crib-type cofferdam under construction from section "G" to east river bank. Aggregate conveyor on suspension bridge shown overhead, and center tower to the left.
1937-01-06
2024-05-02