Surface of vanes of turbine runner L-2. This view of the inner surface of the runner vanes shows where the paint has been eroded to bright metal along the trailing edge of the vanes. The bright surfaces had a sand blasted appearance as evidence of...
1942-07-13
|
1 map : col. ; 45 x 31 cm. or smaller. Relief shown by contours and spot heights. Title supplied by cataloger. Set includes various editions. "Surveyed in 1929-1930". "Contour interval 50 feet. Datum is mean sea level." "Edition of 1934". Highway...
2024-11-22
|
Document: Remarks of Honorable Wayne N. Aspinall before the annual meeting of the Colorado State Grange, October 1, 1966, page 13
1966-10-01
|
2024-11-22
2024-11-22 |
Wicket gates for L-8 turbine resting on generator deck. Mr. H.R. Ramm, U.S.B.R. cleaning and inspecting shafts
1947-06-28
|
Telephoto photograph of home and yards in the Airport Addition to Coulee Dam
1950-09-20
|
Aerial view looking south over Devils Lake
1941-09-21
|
Front cover of the "Planning your Career" publication
1965-11-22
|
General view of excavation operations along bank
1936-11-01
|
Distance view of the future site of Grand Coulee Dam.
2024-11-22
|
View of machinery excavating the bank at the Grand Coulee site
1934-03-02
|
Specs # 2329, Contract I2r 18156, Contractor, Morrison-Knudsen Company Inc. and Peter Kiewit Son's Co. View looking north showing progress made on pumping plant including office wing, parking area, gantry crane, and storage building P-9 through...
1950-09-25
|
Looking up from pit #7 in West Powerhouse--natural illumination
1941-02-14
|
Wheelpit R-8 looking downstream from 965 step. East Powerhouse base.
1940-09-25
|
View of the outlet works near the base of the dam. A man is standing in foreground for scale.
1941-06-26
|
View of the spillway section from the left bank
1941-03-03
|
View of the construction on Grand Coulee Dam
1940-10-23
|
South Coulee Dam--Main Canal Headworks--A view of the headworks structure taken from approximately station 10+00 on the main canal; the main canal pipe crossing is shown in the immediate foreground
1949-06-08
|
Part of the assembly of thrust bearing for generator Shasta L-8 being lowered into position
1943-03-23
|
Winton-Utah Contract on West Canal under Specs. 1286. This view, looking east, shows (right to left) reinforcing steel being placed for Dry Coulee Siphon No. 1, the two invert forms, which fit inside the steel for placing concrete, and the outside...
1947-06-19
|
Stator and bracket assembly for main unit L-6, weighing 335 tons, being lifted into its permanent position in bay 6. Two travelling cranes, with a lifting capacity of 375 tons each, are shown carrying the unit from its temporary point of assembly,...
1943-05-22
|
Placing the last section of the scroll case for L-7 turbine.
1947-03-10
|
96 pound block of concrete found in unit L-4 turbine runner, 3-20-44. The 7/8"" diameter hole in the foreground appears to have been an anchor bolt hole. Rectangular dimensions are 17"" x 11"" while wedge side dimensions are 17"" x 10"" x3""