Browse by Archive

Oregon Digital

View Archive Info

Differences of corresponding readings. Differences of corresponding readings. Gauge No. 3. Gauge No. 4. Difference. Gauge No. 4. Gauge No. 5.1 Difference. 107.5 75.9 31.6 75.9 61.2 14.7 106. 6 74.7 31. 9 74.7 60.2 14.5 105.4 73.0 32.4...

Current measurements—Continued. Place. Date. Stage of river above low-water Surface velocity, in miles per hour. Remarks. On gauge 5. Opposite A 10 R Oct. 25, 1879 5.4 5.3 5.6 5.8 Maximum. 5. 6 Mean. Ten-Mile Rapid,...

Current measurements--Continued. Place. Date. Stage of river above low-water. Surface velocity, in miles per hour. On gauge 5. Opposite [triangle] 45 L June 16, 1880 40. 3 13. 4 Maximum. 11.8 12.7 13.0 10. 5 12.7 12.3 Mean. 2...

A change of regimen of the river at the falls by radical improvement below may make a little different arrangement of locks desirable; the one offered is sufficient for a fairly close estimate of cost. The project provides for full completion of...

WAGON ROAD BRIDGE, SPAN 300 FEET. Bill of lumber. B. M. B. M. Center bents (8) : Piles (lower), 12" x 12" x 50', 600 x 4 piles 2, 400 Piles, (dwarf), 12" x 12" x 15', 180 x 2piles 360 Piles (upper), 12" x 12" x 25', 300 x 3 piles...

(2.) Channel improvement from foot of Three-Mile Rapids to Celilo Falls—Continued. Remarks. Cut No. Depth to low-water. Depth below low-water. Length of cut. Cubic yards above low-water Cubic yards below low-water. 22 31. 0...

(4.) Enlargement of side channel near middle of Dalles Rapids, Oregon shore, to give 8 feet depth at stage of 20 feet on Cascade Gauge No. 2. [Colored yellow on chart.] Depth of water. Width of channel. Cut. Remarks. Station. Feet....

(6.) CELILO CANAL. Abstract of estimate of cost. Protective and wing walls $348, 715 OR Excavation 1, 035, 419 60 Masonry 1,111,460 20 Crib-work 62,977 02 Five pairs gates 86,000 00 Buildings, machinery, culverts, and other...

(c) Estimate of excavation. Designation of section. Area. Average depth of cut. Cubic feet. Cubic yards. Feet. Approach to upper guard-gate 33, 040 4. 2 1, 387, 680 Masonry of upper guard-gate 1, 056 10.6 12, 194 Do 8,260...

(e) Crib work. Feet B. M. At upper entrance on river side 331, 190 At upper entrance on land side 248, 040 At head of upper lock on river side 88, 944 At head of upper lock on land side 79, 140 At foot of canal on river side 1,...

59 p. Includes sections of Appendix OO: 1882 annual report of Capt. Charles F. Powell, Corps of Engineers, detailing construction, surveys and other works of improvement for the Willamette and Columbia rivers. Also included are reports of Philip...
1882-05-15
48TH CONGRESS, 1st Session. HOUSE OF REPRESENTATIVES. Ex. Doc. 1, Part 2. REPORT OF THE SECRETARY OF WAR. BEING PART OF THE MESSAGE AND DOCUMENTS COMMUNICATED TO THE TWO HOUSES OF CONGRESS AT THE BEGINNING OF THE FIRST...
2006-02-13
ANNUAL REPORT OF THE CHIEF OF ENGINEERS, UNITED STATES ARMY.
2006-02-13
[unrelated material omitted] DEFENSES OF THE COLUMBIA. Defenses at the mouth of the Columbia River, Oregon, and Washington Territory, in charge of Capt. C. F. Powell, Corps of Engineers.—The defenses consist of Fort Stevens, an inclosed...
2006-02-13
DEFENSES OF THE COLUMBIA-Continued. year, and for which a platform was then made at the center battery, has been moved to that battery, but is not yet mounted. The service magazines at the left and center batteries are useless without being...
2006-02-13
[unrelated material omitted] IMPROVEMENT OF RIVERS AND HARBORS IN OREGON AND IN WASHINGTON TERRITORY-IMPROVEMENT OF LOWER CLEARWATER RIVER, IDAHO-CONSTRUCTION OF CASCADES CANAL, COLUMBIA RIVER. Officer in charge, Capt. C. F. Powell,...
2006-02-13
July 1, 1882, amount available $909 16 Amount appropriated by act passed August 2, 1882 100,000 00 100,909 16 July 1, 1883, amount expended during fiscal year, exclusive of outstanding liabilities July 1, 1882 88,741 31 July 1, 1883,...
2006-02-13
navigation from Portland to Eugene City and on 12 miles of tributaries, making a distance of 184 miles. The work consists in snagging operations, bar scraping, and for the reach between the Willamette Falls and Corvallis, in the contraction of...
2006-02-13
Amount (estimated) required for completion of existing project $56, 000 00 Amount that can be profitably expended in fiscal year ending June 30, 1885. 56, 000 00 (See Appendix P P 4.) 5. Canal around Cascades of Columbia River, Oregon.—The...
2006-02-13
[unrelated material omitted] 13. Gauging waters of the Columbia River.--The act of August 2, 1882 is the first appropriation for this work. A self-registering gauge was set up at Astoria in February, and has been operated since, and record of...
2006-02-13
9 p. Selected pages from the Annual Report of the Chief of Engineers, United States Army for 1883. Included are annual reports upon works of river and harbor improvements for the Willamette and Columbia rivers.
1883-05-15
48TH CONGRESS, 1st Session. HOUSE OF REPRESENTATIVES. Ex. Doc.1. Part 2. REPORT OF THE SECRETARY OF WAR; BEING PART OF THE MESSAGE AND DOCUMENTS COMMUNICATED TO THE TWO HOUSES OF CONGRESS AT THE BEGINNING OF THE FIRST...

APPENDIXES TO THE REPORT OF THE CHIEF OF ENGINEERS, UNITED STATES ARMY. (CONTINUED.)

[Unrelated materials omitted] APPENDIX P P. IMPROVEMENT OF RIVERS AND HARBORS IN OREGON, AND IN WASHINGTON TERRITORY—IMPROVEMENT OF LOWER CLEARWATER RIVER, IDAHO—CONSTRUCTION OF CASCADES CANAL, COLUMBIA RIVER. REPORT OF CAPTAIN...

The estimate for completion of these works is derived as follows: Saint Helen's Dikes, not commenced, original estimate. $97, 440 Swan Island Dike, not commenced, modified project (1879), proportionate cost of whole to contract awarded...

4451 - 4475 of 5208 Items    << < 174 175 176 177 178 179 180 181 182 183 > >> 

© Western Waters Digital Library - GWLA member projects - Designed by the J. Willard Marriott Library - Hosted by Oregon State University Libraries and Press