Record Details
Field | Value |
---|---|
Title | page 2713 |
Relation | gov serial set 2094 |
Date | 2006-02-06 to 2006-02-08 |
Rights | This item is in the public domain. Acknowledgement of the University of Oregon Libraries as a source is requested. |
Format | Scanned from originals using Silverfast AI 6.0 on UMAX Powerlook III flatbed scanner. Scanned images saved as 16 bit grayscale tiffs. Omnipage 14 used to OCR 8 bit tiffs and generate text files for full text access. 16 bit grayscale and 48>24 RGB color tiffs edited in Photoshop CS 8.0: cropped, rotated, reduced in size, levels adjusted, grayscale bit depth reduced to 8 and JPEGs created. |
Description | (e) Crib work. Feet B. M. At upper entrance on river side 331, 190 At upper entrance on land side 248, 040 At head of upper lock on river side 88, 944 At head of upper lock on land side 79, 140 At foot of canal on river side 1, 227, 888 At foot of canal on land side 124, 032 Total 2,099,234 2,099,234 feet B.M., in place, crib completed, including iron, at $30 per M $62, 977 02 (f) Iron lock-gates. Upper guard-gates. $15, 000 Upper lift-gates 15,000 Middle... |
Identifier | http://oregondigital.org/u?/wwdl,3450 |