Record Details

page 180

Digital Collections at BYU

Field Value
Title page 180 Final supplement to the final environmental impact statement : Diamond Fork System, Bonneville Unit, Central Utah Project, page 180
Coverage Electronic reproduction;
Format 180 text/PDF
Rights Brigham Young University; http://lib.byu.edu/about/copyright/generic.php Public Domain Public
Language English; eng; en
Relation Central Utah Project; Western Waters Digital Library; water associated with the last chance powerplant Power plant construction and sixth water tunnel construction this includes 100 cubic yards of concrete for construction of the flow control structure associated with the powerplant power plant 350 cubic yards for streamflow stream flow protection and 1000 cubic yards for placement of tunnel spoil b monks hollow dam and reservoir approximately 150000 cubic yards of fill will be needed to construct the dam for the recommended plan and alternative A c three forks dam approximately 65000 cubic yards of fill will be needed to construct the dam for alternative C d diamond fork pipeline it is anticipated that the diamond fork stream channel will be crossed 810 8 10 times requiring about 500 yards of fill to construct the pipeline crossings A channel change of about 900 lineal feet of stream fill will also be required in four locations locationsc location sc approximately 30 cubic yards of fill will be needed to construct the pipeline under wanrhodes nrhodes Wa creek e diamond fork road rehabilitation two stream crossings will be required at Wa nrhodes creek and at little diamond creek about 500 yards of fill will be placed at these locations slope restoration and riprap protection will be provided along 3 3100 100 feet of diamond fork road and the diamond fork channel at 12 different locations requiring approximately 7200 cubic yards of riprap and 5 5000 000 ooo cubic yards of backfill this action will restore damage caused by flooding in 1984 f diamond fork powerplant Power plant approximately 460 cubic yards of fill will be needed to construct the structure it is anticipated that most of the fill will be used for the tailrace construction g stream mitigation approximately 2000 cubic yards of material will be placed into diamond fork to improve straa stream saraa m habitat h recreation facilities at monks hollow dam approximately 500 cubic yards of fill will be needed to construct the facilities 180 I 1
Identifier http://cdm15999.contentdm.oclc.org/cdm/ref/collection/WesternWatersProject/id/13022

© Western Waters Digital Library - GWLA member projects - Designed by the J. Willard Marriott Library - Hosted by Oregon State University Libraries and Press