Record Details

page 254

Digital Collections at BYU

Field Value
Title page 254 Final supplement to the final environmental impact statement : Diamond Fork System, Bonneville Unit, Central Utah Project, page 254
Coverage Electronic reproduction;
Format 254 text/PDF
Rights Brigham Young University; http://lib.byu.edu/about/copyright/generic.php Public Domain Public
Language English; eng; en
Relation Central Utah Project; Western Waters Digital Library; S T 0 N E F L Y S 0 C cl I 1 E T Y member club federation of fly ashers fshers 14 end ent T routunlimited rout Unlimited WASW QF OF THE WASATCH WASWC T C june 20 1989 regional environmental officer bureau of reclamation 125 south state street salt lake city utah 84147 dear sir I 1 appreciate the opportunity to comment on 4 concerns regarding the draft supplement to the final environmental impact statement diamond fork system bonneville unitcentral unitlcentra Unit Central 1 utah project 1 piecemeal project planning this document represents a piece meal approach to project planning it indicates that the diamond fork facility will transport an unspecified amount of water to an unspecified location for unspecified uses after approval of this document bythe by the EPA and army corps of engineers the US bureau of reclamations will fill in i these blank spots as they desire resolution of the uintah basin streamflows strearnflows stream flows issue the uteindian ute indian water conflict and the fate of oi the bonneville irrigation and drainage system will all have a significant impact on the diamond fork system approval of the diamond fork system should be combined with an EIS document addressing these issues together rather than in isolation 2 massive increase in jn sixth water flows A major project alteration is the deletion of the 3 mile long pipeline connecting the last chance power plant with themonks the monks hollow dam this will produce large increases in strearnflow streamflow stream flow on sixth water creek the following chart presents these flow changes flow of sixth wate waier waie waler r creek below the last chance power plant in cubic feet per second 600 T 500 400 IH PRECUP PRE CUP 300 POSTCUP POST CUP 200100 0 N D J F M A M J J A S month of the year 5968 south 4000 west kearns kearnsutah84118 utah 84118 coi col ool ooi c01 r01 9672834 9673834 967 2834 254 BEST COPY AVAILABLE
Identifier http://cdm15999.contentdm.oclc.org/cdm/ref/collection/WesternWatersProject/id/12980

© Western Waters Digital Library - GWLA member projects - Designed by the J. Willard Marriott Library - Hosted by Oregon State University Libraries and Press