Record Details

page 109

Digital Collections at BYU

Field Value
Title page 109 State review, Bonneville Unit, Central Utah Project, Final report, page 109
Coverage Electronic reproduction;
Format 109 text/PDF
Rights Brigham Young University; http://lib.byu.edu/about/copyright/generic.php Public Domain Public
Language English; eng; en
Relation Central Utah Project; Western Waters Digital Library; reclamation briefly addressed this alternative in the 1979 final environmental impact statement on the municipal and industrial system bac background the bureau of reclamation states that the construction and operation of jordanelle Jor danelle reservoir is not dependent on the water supply developed by diking utah lake or on construction of features of the diamond fork power system it does however provide the flexibility for these two systems to be constructed at a later date and be operated at maximum efficiency the wallsburg vjahsburg Walls wails burg tunnel project which is an alternative to jordanelle Jor danelle reservoir would eliminate much of this operational flexibility also the jordanelle Jor danelle reservoir project is a multipurpose project that not only provides the necessary water supply but also provides benefits of power recreation fisheries and flood control the Walls wails wallsburg watlsburg burg tunnel alternative would not provide as great a benefit to these purposes for these reasons and because the cost of the wails Walls wallsburg watlsburg burg tunnel alternative january 1 1978 costs would be greater than that for the jordanelle Jor danelle reservoir the waits Watts Walls wallsburg wattsburg burg bung tunnel alternative was eliminated from further consideration as a viable plan of development by the bureau of reclamation water supply construction of the wails Watts Walls rails ralis walis wallsburg wattsburg burg tunnel and pipeline system in conjunction with a small 30000 acre foot keetley reservoir on the provo river would provide the same water supply as would the jord Jor Jora joy doy joya jordanelle joraanelle danelle anelle reservoir costs based on january 1 1978 costs construction of the Walls WaHs wals wallsburg wahsburg wahlburg burg tunnel alternative would cost about 25 percent more than would the construction of the J Jor dor don or danelle reservoir jordanelle Jor danelle 1312 131.2 1312 million halis watts Walls hails wallsburg wattsburg burg alternative 1632 163.2 1632 million the january 1 1983 cost estimate puts the cost of 109
Identifier http://cdm15999.contentdm.oclc.org/cdm/ref/collection/WesternWatersProject/id/10999

© Western Waters Digital Library - GWLA member projects - Designed by the J. Willard Marriott Library - Hosted by Oregon State University Libraries and Press