Record Details

page 110

Digital Collections at BYU

Field Value
Title page 110 State review, Bonneville Unit, Central Utah Project, Final report, page 110
Coverage Electronic reproduction;
Format 110 text/PDF
Rights Brigham Young University; http://lib.byu.edu/about/copyright/generic.php Public Domain Public
Language English; eng; en
Relation Central Utah Project; Western Waters Digital Library; jordanelle Jor danelle dam and reservoir at 354985000 and the cost of the wallsburg walls burg alternative at between 250 million minion and 300 million this disparity in costs indicates that the cost of the jordanelle Jor danelle project has risen faster than the cost of the wallsburg walls burg tunnel alternative the cost estimate for the wallsburg walls burg tunnel alternative is a reconnaissance level cost estimate only much of the data was obtained using contour maps without the aid of detailed field work and geology reports estimates assume that construction of both the wallsburg Walls burg tunnel project and the keetley reservoir could be performed using conventional construction techniques under ideal conditions experience has shown that costs generally increase when more data are obtained and as the project moves closer to construction effects on the diamond fork power system construction of the wallsburg walls burg tunnel alt ait alternative alternat altermat ernat ive lve would probably eliminate the economic feasibility of any power development at diamond fork by reducing the flow in diamond fork by 50 percent from 198000 acre feet to approximately 98000 acre feet studies indicate that there would not be enough water to economically justify the expense of constructing the pipelines and power plants needed for power production table 5.2 52 52 shows a comparison of power plant capacity and power generation of the diamond fork power system 1984 plan in conjunction with the jordanelle jordanehe joc Jor danelle daneHe project and the Walls waHs hahs hals wails walis wahlburg wahsburg wallsburg burg tunnel alternative annual power production with the waits walts Walls wails tails saltsburg waltsburg wallsburg burg tunnel alternative would be less than half that generated with jordanelle Jor danelle reservoir in combination with a diamond fork power system 110 no ilo iio
Identifier http://cdm15999.contentdm.oclc.org/cdm/ref/collection/WesternWatersProject/id/10829

© Western Waters Digital Library - GWLA member projects - Designed by the J. Willard Marriott Library - Hosted by Oregon State University Libraries and Press