Record Details

page 38

Digital Collections at BYU

Field Value
Title page 38 Regional director's report of February 1951 on Central Utah Project, Utah : a supplement to The Colorado River Storage Project Report, page 38
Coverage Electronic reproduction;
Source United States Department of the Interior Bureau of Reclamation Region 4
Publisher Brigham Young University
Date 2005-10-13
Format 38 text/PDF
Rights Brigham Young University; http://lib.byu.edu/about/copyright/generic.php Public Domain Public
Language English; eng; en
Relation Central Utah Project; Western Waters Digital Library; kH APTER CHAPTER 111 III ili DESIGNS aid AND bid lid estimates etipiates ebtimates etl ETI plates PiATES round knoll dam this dam would be located on round valley creek about 3.5 35 35 miles west of wallsburg Walls burg in wasatch county utah it would form a lake of 6100 acre foot capacity to be utilized for recreation and fish and wildlife purposes the dam would be a zoned rolled earth and rock fill structure containing 238000 cubic yards it would rise 75 feet above stream bed and would be 530 feet long at the cresto crest redd diversion dam redd diversion dam would be bb located on hobble hobbie creek 1.5 15 15 miles northwest of springville Spring ville in utah county utah utaho itaho it would be used to divert 1200 second feet into the redd south canal and 100 second feet into the redd north canalo canal palmyra diversion dam this damwould dam dan would be bt located on spanish fori fork river 3.5 35 35 3 5 miles northwest of spanish fork in utah county utah it would divert 100 second feet into the palmyra canal provo bay drainage pumping plant this plant would be located at the southern end of provo bay dike about 55 miles southwest of provo in utah county utah it would consist of four pumping units each with a capacity of 100 second feet provo bay irrigation pumping plant this plant would be located about 4 miles northwest of spanish fork in utah county utah it would supply the palmyra canal and would consist of three pumping units two with capacities of 40 second feet and one with a capacity of 20 second feet redd south canal canalo this canal would divert from the redd diversion dam to supply irrig irrigation ion lon water for lands in the southern part of provo bay it would terminate at spanish fork river the canal would be bt 5.5 55 55 miles in length and would have a capacity of 1200 second feet reet redd north canal canalo this canal would divert from redd diversion dam to supply irrigation water for lands in the northern part of provo bay say it would terminate at provo river the canal would be 88 8.8 88 in length it would have one section with a capacity of 100 second feet and on one sectionwith section with a capacity of 150 second feet palmyra pamra canal canalo this canal would head at palmyra diversion dam and would extend to a point on hobble creek about 1.5 15 15 mil nils nil nii mils miles s northwest of springville Spring ville in utah county utah it would be 5.5 55 55 mils in length and would have a capacity of 100 second feet jordan river channel channt chanat 1 l improvement seven mil mii miles mils mlis mlls s of the tht aht jordan rivcrr rivcx rivca channel cn annel annei extending frcm fram the northern end of utah lake to jordan narrows at the salt lake utah county line would be improved the tht aht capacity of the channel would be increased to 1800 second feeto feet reet feato 38
Identifier http://cdm15999.contentdm.oclc.org/cdm/ref/collection/WesternWatersProject/id/9879

© Western Waters Digital Library - GWLA member projects - Designed by the J. Willard Marriott Library - Hosted by Oregon State University Libraries and Press