Record Details

page 6

Digital Collections at BYU

Field Value
Title page 6 Final environmental impact statement on the Provo River Restoration Project, page 6
Coverage Electronic reproduction;
Format 6 text/PDF
Rights Brigham Young University; http://lib.byu.edu/about/copyright/generic.php Public Domain Public
Language English; eng; en
Relation Central Utah Project; Western Waters Digital Library; contents page summary continued 57 5.7 57 summary of chapter 4 consultation and coordination S 13 571 57.1 571 development of the draft EIS S 14 572 57.2 572 review of the draft EIS S 14 58 5.8 58 implementation program S 15 chapter 1 description of the proposed action and alternatives 1.1 11 li ii introduction 11 1 1 1 lil 111 lal ial III 1 1 history and background 11 1 1 111.1 1111 lill lili the source of mitigation obligations 11 1 1 111.2 1112 mitigation commission 13 1 3 111.3 1113 why the middle provo river was chosen 13 1 3 1.2 12 12 purpose and need 14 1 4 12.1 121 need for the proposed action and alternatives 14 1 4 12.2 122 122 purposes of the proposed action and alternatives 14 1 4 1.3 13 13 overview of the proposed action and alternatives 15 1 5 13.1 131 131 location of the proposed action and alternatives 15 1 5 13.2 132 132 the proposed action riverine habitat restoration 15 1 5 132.1 1321 1321 location and acquisition 15 1 5 132.2 1322 1322 channel features 17 1 7 132.3 1323 floodplain Flood plain features 17 1 7 132.4 1324 land management 17 1 7 13.3 133 existing channel modification alternative 111 1 11 133.1 1331 location and acquisition 111 1 11 133.2 1332 1332 channel features 111 1 11 133.3 1333 1333 floodplain Flood plain features 111 1 11 133.4 1334 1334 land management 111 1 11 13.4 134 134 In instream mstream stream astream structures alternative 111 1 11 134.1 1341 1341 location and acquisition 111 1 11 134.2 1342 1342 channel features 111 1 11 134.3 1343 1343 floodplain Flood plain features 111 1 11 134.4 1344 1344 land management 111 1 11 13.5 135 135 no action alternative 114 1 14 135.1 1351 1351 acquisition 114 1 14 135.2 1352 1352 channel and floodplain Flood plain features 1 .1 114 14 135.3 1353 land management 114 1 14 13.6 136 136 major differences between the proposed action and alternatives 114 1 14 1.4 14 description of the implementation and management of baseline conditions 120 1 20 14.1 141 141 implementation of baseline conditions for the provo river corridor 120 1 20 141.1 1411 recreation access points 120 1 20 141.2 1412 1412 pedestrian access 120 1 20 141.3 1413 1413 corridor fencing 120 1 20 141.4 1414 corridor management and size 120 1 20 141.5 1415 1415 instream In stream flows 120 1 20 141.6 1416 integration of baseline with the alternatives 121 1 21 6
Identifier http://cdm15999.contentdm.oclc.org/cdm/ref/collection/WesternWatersProject/id/7464

© Western Waters Digital Library - GWLA member projects - Designed by the J. Willard Marriott Library - Hosted by Oregon State University Libraries and Press