Record Details

page 91

Digital Collections at BYU

Field Value
Title page 91 Final Environmental Statement : authorized Bonneville Unit, Central Utah Project, Utah, page 91
Coverage Electronic reproduction;
Source Bureau of Reclamation. Department of the Interior
Publisher Brigham Young University
Date 2005-10-14
Format 91 text/PDF
Rights Brigham Young University; http://lib.byu.edu/about/copyright/generic.php Public Domain Public
Language English; eng; en
Relation Central Utah Project; Western Waters Digital Library; 1 upper provo river reservoir st stabilization abilization labilization the upper provo river area contains many natural lakes 15 of which have had additional water impounded by dams these reservoirs have a total capacity of 13000 acre feet and provide late season irrigation water for downstream appropriators the reservoirs have fluctuated widely in the past filling usually occurs through winter months with maw max maximum imum icum water surface increases during the months of april and may drawdown begins in about july and is complete by late august 2 the forest service has recommended that 14 of these lake reservoirs be converted to permanent lakes with stabilized capacities and water levels reconstruction of some of the dams is proposed one lake would continue to be utilized to store 2030 acre feet of irrigation water for use on lands above jordanelle Jor danelle reservoir that lake would continue to fluctuate as in the past the reservoirs are accessible by road and trail six of these lakes are near existing roads and one additional lake will be served by a new road according to the wasatch national forest transportation plan trail access only would be provided to the remaining eight lakes physical data on the 15 reservoirs are shown in table AT A T 7 2 jordanelle Jor danelle reservoir jordanelle Jor danelle dam and reservoir would be located on the provo river about 6 miles north of heber city it would provide storage of bonneville unit water at an upstream site by exchange for bonneville unit water in utah lake and most of the water thatis that is presently regula reguia regulated ted tea in 15 small reservoirs on the headwaters of provo river municipal and industrial water stored in jordanelle Jor danelle reservoir would be delivered to saltlake salt sait lake county through the provo river the rehabilitated provo reservoir canal and the buried jordan aqueduct and to northern utah county through the provo river and the proposed alpine aqueduct jordanelle Jor danelle reservoir would be a long term tern holdover reservoir the maximum content would occur during periods of high inflow and low demands and the minimum content would occur during periods of low inflow and high demands the reservoir would have emptied only once in the 40 year period from 1921 through 1960 eggo 91
Identifier http://cdm15999.contentdm.oclc.org/cdm/ref/collection/WesternWatersProject/id/5558

© Western Waters Digital Library - GWLA member projects - Designed by the J. Willard Marriott Library - Hosted by Oregon State University Libraries and Press