Record Details

page 84

Digital Collections at BYU

Field Value
Title page 84 Final Environmental Statement : authorized Bonneville Unit, Central Utah Project, Utah, page 84
Coverage Electronic reproduction;
Source Bureau of Reclamation. Department of the Interior
Publisher Brigham Young University
Date 2005-10-14
Format 84 text/PDF
Rights Brigham Young University; http://lib.byu.edu/about/copyright/generic.php Public Domain Public
Language English; eng; en
Relation Central Utah Project; Western Waters Digital Library; lands can be cultivated canals to deliver irrigation water to the lands and hobble creek diversion dam and springville Spring ville and provo bay bypasses to carry hobble creek water around the dike pumping plants would be required to pump drain water into the lake and to pump water from the lake into provo bay canal for irrigation use in the bay area under this plan about 6800 acres of land could be reclaimed for agricultural production in provo bay and about 2700 acres adjacent to the bay could be provided a supplemental water supply thi thl this s development would be a carefully integrated plan and would include 48 farm units with homes and farmsteads that would average about iko 140 eko eho acres each however to sustain agricultural production both an irrigation and a drainage system would have to be provided the drainage system would maintain the water table at depths to permit sustained production of deep rooted crops it would consist of a network of open outlet collector and open lateral drains which would serve as an outlet for a system of closed subsurface tile drains the irrigation and drainage systems with the exception of the closed tile drains and proposed major access roads to the farm units are shown in figure A 25 the drainage system would include about 65 miles of closed tile subsurface drains about 22 miles of open lateral drains and about 11 miles of open main outlet collector drains the open lateral collector drains and the open main outlet collector drains would receive all surface runoff resulting from storms and irrigation waste in addition to all perimeter inflow to the bay the access roads built parallel to the open drains would become part of the county road system and would provide ready access to the existing county roads surrounding the bay to minimize the area taken out of production for right of way purposes the project irrigation system would also be built adjacent to and parallel to the open lateral drains and roads the project irrigation distribution system would provide an outlet on the high point of each farm unit a provo bay drains pumping plant the provo bay drains pumping plant would lift surface and subsurface drainage water from provo bay through the provo bay dike into utah lake the pumping plant would be located southwest of provo along the provo bay canal near the southwest corner of the provo bay area physical data on the plant are given in table A 6 84
Identifier http://cdm15999.contentdm.oclc.org/cdm/ref/collection/WesternWatersProject/id/5417

© Western Waters Digital Library - GWLA member projects - Designed by the J. Willard Marriott Library - Hosted by Oregon State University Libraries and Press